Horse corral replacement with steel pipe and concrete
Big Springs Horse Corral Replacement, Solicitation 9cb4a1f8242643b681eba8f83c18a82f, issued by Federal (Wyoming offices).
Key facts
- Issuing agency
- Federal (Wyoming offices)
- Solicitation number
- 9cb4a1f8242643b681eba8f83c18a82f
- Type
- Combined Synopsis/Solicitation
- Posted
- Sep 24, 2026
- Response deadline
- Oct 29, 2026, 7:00 PM EDT
- Place of performance
- Moran, WY, 83013
- Set-aside
- Small Business Set Aside - Total
Official description
This project includes supply and installation of steel oil pipe for one 20'x60' corral with three pens and concrete for post embedment, including temporary traffic control. Local traffic shall be closed during construction with temporary traffic control measures inplace. Including sign stating horse corrals are closed to public for the duration of project. Optional work that may be awarded includes all work described above associated with: 1.Option #1: Supply and construct one additional 20'x60' corral with three pens. 2.Option #2: Supply and install hitching rail.
Solicitation #1240LT26Q0179. Issued by AGRICULTURE, DEPARTMENT OF › FOREST SERVICE › BRIDGER-TETON NATIONAL FOREST. NAICS 238990. Product/Service Code Y1PZ.
Respond to this bid
This solicitation is administered by the issuing agency through SAM.gov, the federal contracting system. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.
The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.