ClosedSet-aside: SB

Big Piney Office Interior Sewer Line Replacement

Big Piney Office Interior Sewer Line Replacement, Solicitation 06461d780fa54ffe92bc48e578f44314, issued by Federal (Wyoming offices).

Key facts

Issuing agency
Federal (Wyoming offices)
Solicitation number
06461d780fa54ffe92bc48e578f44314
Type
Solicitation
Posted
Aug 14, 2026
Response deadline
Sep 14, 2026, 7:00 AM EDT
Place of performance
Big Piney, WY, 83113
Set-aside
Small Business Set Aside - Total

Official description

This project consists of replacement of the sewer line and related repair work on the Big 1.2 Piney Ranger Station on the Bridger-Teton National Forest (NF). The facility is operated by the Bridger-Teton NF on the Big Piney Ranger District in Big Piney, Wyoming. Work will include demolition of finished flooring as needed, demolition of concrete slab along 81’ of sewer line, disconnection of 17 plumbing fixtures, replacement of sewer line, patching of concrete slab and replacement of aggregate, reconnection of 17 plumbing fixtures, and replacement of finished flooring. Work includes the removal and proper disposal of all demolished materials. The contractor shall provide all required materials. Quotes should describe the method that will be used to replace the sewer line, and what areas will be effected by related demolition work.

Solicitation #1240LT26Q0154. Issued by AGRICULTURE, DEPARTMENT OF › FOREST SERVICE › BRIDGER-TETON NATIONAL FOREST. NAICS 237110. Product/Service Code Y1ND.

Respond to this bid

This solicitation is administered by the issuing agency through SAM.gov, the federal contracting system. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.