HVAC improvements at water treatment facility
ITB No. 26-2989-8EAR - Water Treatment Facility - HVAC Improvements, Solicitation IV126906, issued by Henrico County.
At a glance
Henrico County is seeking bids for HVAC system replacement and upgrades at its Water Treatment Facility and Raw Water Pump Station in Richmond, VA. The work includes removal of multiple air-cooled units and chillers, installation of new HVAC systems, DDC controls, plumbing modifications for emergency fixtures, and structural support work, to be completed in three phases by September 2026.
Key facts
- Issuing agency
- Henrico County
- Solicitation number
- IV126906
- Type
- Invitation for Bids (IFB)
- Posted
- Aug 21, 2026
- Response deadline
- Sep 30, 2026, 3:00 PM EDT
- Place of performance
- Department of Public Utilities (Henrico County)
Official description
The Work consists of all work required by the Construction Documents necessary for the HVAC Improvements project at the Henrico County Department of Public Utilitiesâ Water Treatment Facility (WTF) located at 10111 Three Chopt Road, Richmond, VA; and Raw Water Pump Station (RWPS) located at 1201 South Gaskins Road, Richmond, VA, including removal and disposal of ACU-8 and associated ACC-2, ACU-9 and associated ACC-3, ACU-10 and associated ACC-5, ACU-11 and associated ACC-6, ACU-7 and associated ACC-4, ACU-6 and associated ACC-1 and all associated refrigeration piping, piping accessories and supports serving the main water plant. Work at the main water plant also includes the removal and disposal of the air-cooled chiller (CHIL-1) located outside on grade. Work also consists of the removal and disposal of ACU-1 and associated ACC-1 and all associated refrigerant piping, piping accessories, and supports at the Raw Water Pumping Station as well as the removal and disposal of the through-the-wall air conditioner (WAC-1) serving the control room in the pumping station. All refrigerant must be recovered from existing systems and disposed of in compliance with local, state and federal regulations prior to systems demolition. All systems listed above will be replaced and the DDC system serving the Water Treatment Facility, Washwater/Sludge Pump Station, and the Raw Water Pump Station will be replaced in its entirety along with associated control components. Plumbing work includes the provision of floor drains in the lab space to serve the existing emergency plumbing fixtures. These drains will be tied into a new neutralization basin located in the interstitial space, and tied in parallel to the existing neutralization basin. A new tepid water circulation line will be installed between the water heaters and the emergency plumbing fixtures in order to provide immediate access to tepid water at the emergency fixtures. Supporting structural and architectural work includes, but not limited to, enlarging interior door opening in CMU wall, pipe penetrations through CMU and concrete, concrete equipment pads, and supplemental steel framing and flashing at new openings in the metal roof deck. The Work shall be completed over three (3) phases. Work under each of the three phases may be completed concurrently, but priority shall be given to Phase 1, followed by Phase 2, then Phase 3. Accordingly, substantial completion times have been applied to each of the work completion phases. TAB work for each item of equipment shall be included in the phase where that equipment is installed.
Respond to this bid
This solicitation is administered by the issuing agency through eVA, Virginia’s eProcurement marketplace. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.
The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.