Where
More filters
State agencies only
Set-aside / certification
OpenResponses due Oct 28, 2026, 5:00 PM EDT

Antelope Island well replacement and water main connection

DFCM Construction - Standard Low Bid - Department of Natural Resources/Division of State Parks - Antelope Island Well Replacement - Project #27211510, Solicitation 256109, issued by Utah Division of Facilities Construction and Management.

At a glance

Utah's Division of State Parks is seeking bids to drill a new 8-inch diameter well on Antelope Island to approximately 550 feet deep, install connecting pipes and infrastructure to the existing water main, and construct associated manholes and appurtenances. The estimated construction cost is $370,000, with bids due October 28, 2026.

Key facts

Solicitation number
256109
Posted
Sep 29, 2026
Response deadline
Oct 28, 2026, 5:00 PM EDT
Place of performance
Davis County, UT
Official posting
Documents, addenda and the procurement contact, free with an account.
  • well drilling
  • water infrastructure
  • construction
  • plumbing
  • government bid

Respond to this bid

This solicitation is administered by the issuing agency through its Bonfire procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.

Official description

Issued by EXECUTIVE BRANCH AGENCIES - DFCM - Division of Facilities Construction and Management. Reference #CS27021. **INVITATION TO BID**

The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the referenced project:

**Project Description: Pad for new well, Drill new 8-inch diameter well to approximately 550-feet below ground surface, Well Manhole, 6-inch pipes, valves, fittings, and appurtenances from new well to connect to existing 6-inch diameter water main. Meter Manhole with pipes, fittings, valves and appurtenances.

Contractor to review Spec section 1.12 for Permits and inspections required to be provided by Contractor**

**Construction Cost Estimate: $370,000.00** Project closes Oct 28, 2026 3:00 PM MDT.

Don’t miss the next one

Save this bid and SledAtlas keeps its deadline for you. Save a search for well drilling from the card on the left and the next one lands in your inbox on the day it posts.

What happens when you save this bid

  • It goes on your calendar. The response deadline land on your SledAtlas calendar and in your own calendar app through your private feed.
  • You get reminded. One email on each of the days you choose before the deadline (your account default applies until you change it for this bid), and a line on your calendar card until you dismiss it.
  • You hear about changes. If the deadline moves, a pre-bid meeting is added or the status changes, it is in your next daily email.
  • Your notes and documents live on the job. Private to you, on the bid’s own page under My bids.

Create a free account and come straight back to this bid. No card, no password; a sign-in code by email or one click with Google.

Why this bid is on SledAtlas

We read every Utah source we have, and federal work performed in Utah, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.