Arlington Outlet overhead crane replacement
Arlington Outlet Overhead Crane Replacement, Solicitation 25-030, issued by Tarrant Regional Water District.
At a glance
Tarrant Regional Water District seeks proposals to replace a 3-ton electrically operated overhead crane with double trolley system at its Arlington Outlet facility. Work includes structural and electrical engineering, installation compliant with NEC/NESC codes, scheduling, quality management, and final site cleaning. Deadline was December 6, 2024.
Key facts
- Issuing agency
- Tarrant Regional Water District
- Solicitation number
- 25-030
- Portal id
- 129059
- Type
- purchase
- Posted
- Nov 7, 2024
- Response deadline
- Dec 6, 2024, 3:00 PM EST
- Questions due
- Dec 2, 2024, 1:00 AM EST
- Award expected
- Dec 17, 2024, 11:59 AM EST
- Place of performance
- Tarrant County, TX
- Official posting
- Documents, addenda and the procurement contact, free with an account.
Respond to this bid
This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.
The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.
Official description
Solicitation #25-030. Issued by Infrastructure Engineering. The Tarrant Regional Water District (Owner) is requesting Proposals for the construction of the following project: Arlington Outlet Overhead Crane Replacement Brief Description of Work: 1. Replacement and commissioning of the overhead crane at Arlington Outlet facility a. Capacity requirement of 3 tons, electrically operated b. A double trolley system is required c. Structural and electrical engineering services will be required 2. Electric equipment, materials and installation shall comply with the National Electrical Code (NEC), National Electrical Safety Code (NESC), and with the latest edition of the applicable codes and standards. 3. Prepare and submit schedules for the Work and update schedules at their prescribed frequency for the duration of the Project. 4. Implement a quality management system to control the quality of the Work and verify that the Work meets the standards of quality established in the Contract Documents. 5. Perform a thorough cleaning of the Site, buildings, or other structures prior to Owner occupancy of the buildings, and prior to final completion. Leave the Project clean and ready for occupancy.
Open bids like this one
This one has closed, but there are 12 open overhead crane bids nationwide right now. Save a search for overhead crane from the card on the left and the next one lands in your inbox on the day it posts.
- OpenDue Oct 6, 2026
- OpenDue Oct 7, 2026
- OpenDue Oct 8, 2026
- OpenDue Oct 8, 2026
- OpenDue Oct 12, 2026
Why this bid is on SledAtlas
We read every Texas source we have, and federal work performed in Texas, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.