Power delivery engineering services for municipal utility
Power Delivery General Engineering Services, Solicitation 2026-RFP-0300, issued by City of Pasadena.
At a glance
City of Pasadena Water & Power Department seeks qualified engineering firms to supplement internal staff on electric power delivery projects including substation design, SCADA systems, renewable energy, EV charging infrastructure, and system planning. Proposers must have 5+ years of relevant experience and 5+ completed projects in requested scope areas; California-licensed engineers required. Work assigned via task orders with no guaranteed minimum volume.
Key facts
- Issuing agency
- City of Pasadena
- Solicitation number
- 2026-RFP-0300
- Portal id
- 264045
- Type
- purchase
- Posted
- Sep 24, 2026
- Response deadline
- Oct 22, 2026, 6:00 PM EDT
- Questions due
- Oct 8, 2026, 7:00 PM EDT
- Place of performance
- Los Angeles County, CA
- Official posting
- Documents, addenda and the procurement contact, free with an account.
Respond to this bid
This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.
The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.
Official description
Solicitation #2026-RFP-0300. Issued by Water & Power Department, Power Delivery. The City of Pasadena is seeking qualified professional engineering firms to supplement its internal resources within the Water and Power Department (PWP), Power Delivery Division. Engineering services provided under the resulting contracts will support the safe, reliable, and efficient operation, maintenance, modernization, and improvement of PWP's electric power delivery system. Engineering services under this RFP are organized into the following Scope of Work Groups: Receiving Station and Substation Design SCADA, Automation, Communications, and Control Design System Planning Civil and Structural Engineering Electric Vehicle Charging Infrastructure Renewable Energy, Energy Storage, Interconnection, and Technical Advisory Services Associated services, including construction management, inspection, drafting, and other technical support, may be required as part of an individual task order where applicable to the assigned Scope of Work Group. Engineering services under the resulting contracts are intended to supplement, not replace, PWP's internal engineering resources. Consultants may be assigned work based on project-specific needs, staff availability, schedule requirements, temporary workload conditions, and the need for specialized expertise. All consultant designs and deliverables shall be subject to review and approval by the responsible PWP engineering group. Consultants shall not supervise City employees or exercise project management authority over City staff. Work that is ongoing, predictable, or programmatic over multi-year periods will generally be performed by permanent PWP staff. The City intends to award multiple contracts under this solicitation to establish a pool of qualified engineering consultants. Work will be authorized through individual task orders based on the requirements of the assignment, including consultant availability, applicable expertise, capacity, schedule, and other considerations identified by the City. Award of a contract does not guarantee any minimum quantity or value of work. Current priority programs anticipated for consultant support include, but are not limited to: SCE Upgrade of the TMG 220 kV Gould Circuit; Jungle-MUX Fiber Optic Upgrades; SCADA/OMS/DMS upgrades; Mobile Substation protection, housing, and station upgrades; substation equipment specifications; EV charging infrastructure at Aquatic Center, Sunset Reservoir, and Del Mar Garage; the Avon Ramp and Arroyo Charging Depots Progressive Design-Build project; Municipal Solar, Energy Storage, and Resilience Projects; System Impact Studies for Large Resource Interconnections; System Modeling for Compliance Studies; TMG Receiving Station capacity studies; and Subtransmission System short-circuit current reduction studies. This list is illustrative and does not constitute a guarantee that any particular project or assignment will be issued under the resulting contracts. Proposers must demonstrate, at a minimum, five (5) years of relevant experience and at least five (5) completed projects within the past five (5) years for each Scope of Work Group proposed. Consultant staff shall include engineers registered in the State of California in the relevant disciplines, including civil, electrical, structural, mechanical, control systems, and/or fire protection engineering, as applicable to the services being performed. Specific minimum qualifications for each Scope of Work Group are stated in Section 6.
Don’t miss the next one
Save this bid and SledAtlas keeps its deadline for you. Save a search for electrical engineering from the card on the left and the next one lands in your inbox on the day it posts.
- OpenDue Oct 2, 2026
- OpenDue Oct 9, 2026
- OpenDue Oct 9, 2026
- OpenDue Oct 13, 2026
- OpenDue Oct 14, 2026
What happens when you save this bid
- It goes on your calendar. The response deadline and the questions deadline land on your SledAtlas calendar and in your own calendar app through your private feed.
- You get reminded. One email on each of the days you choose before the deadline (your account default applies until you change it for this bid), and a line on your calendar card until you dismiss it.
- You hear about changes. If the deadline moves, a pre-bid meeting is added or the status changes, it is in your next daily email.
- Your notes and documents live on the job. Private to you, on the bid’s own page under My bids.
Create a free account and come straight back to this bid. No card, no password; a sign-in code by email or one click with Google.
Why this bid is on SledAtlas
We read every California source we have, and federal work performed in California, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.