East Marginal Way S pavement overlay and bike lane work
East Marginal Way S Preservation (FHWA), Solicitation PW#2025-057, issued by City of Seattle.
What this job goes for
IntelligenceWashington paving bid results, every bidder’s price, Apr 2025 to Jun 2026.
Unit prices for this job’s items
- REMOVE CEM CONC SIDEWALK · per sq ydBids usually run (the middle of 10 jobs). Most fall between and .
- SAWCUT ASPHALT CONCRETE, FULL DEPTH · per lin ftBids usually run (the middle of 9 jobs). Most fall between and .
- PAVEMENT, HMA (CL 1/2 IN) · per tonBids usually run (the middle of 9 jobs). Most fall between and .
- REMOVE ASPHALT PAVEMENT · per sq ydBids usually run (the middle of 7 jobs). Most fall between and .
- CLEARING & GRUBBING · per sq ftBids usually run (the middle of 7 jobs). Most fall between and .
- LANE MARKER, TYPE 2 · per eachBids usually run (the middle of 6 jobs). Most fall between and .
- REMOVE TREE · per eachBids usually run (the middle of 3 jobs). Most fall between and .
- PAVEMENT MARKING, MMA, 6 IN STRIPE · per lin ftBids usually run (the middle of 3 jobs). Most fall between and .
And 1 more item.
The job
Seattle Public Works is seeking a contractor for a $10.8M infrastructure project on East Marginal Way South involving pavement overlay, base repairs, protected bike lane rechannelization, and shared use path improvements. Work includes milling, asphalt surfacing, curb ramps, sidewalks, drainage, signals, lighting, and landscaping from 1st Ave South to Tukwila City Limits. Bid due November 18, 2026.
- Trade
- Paving and asphalt
- Also includes
- Concrete, sidewalk, curb; Storm drainage, culverts, erosion; Electrical and lighting; Pavement markings and signs; Landscaping, mowing, grounds
- Kind of work
- Pavement overlay, spot base repairs, rechannelization with protected bike lane and shared use path
- The work
- Replacement
- Contract
- One job
- Who can bid
- Any qualified firm.
- Issuing agency
- City of Seattle
- Solicitation number
- PW#2025-057
- Portal id
- 309797
- Type
- purchase
- Posted
- Oct 14, 2026
- Response deadline
- Nov 18, 2026, 5:00 PM EST
- Questions due
- Nov 12, 2026, 8:00 PM EST
- Place of performance
- King County, WA
Official posting
Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).
Official description
Solicitation #PW#2025-057. Issued by Public Works. Project Description: Project consists of pavement overlay and spot base repairs and rechannelization for a protected bike lane and shared use path. Work includes milling, pavement removal, excavation, concrete and asphalt base repair, asphalt surfacing, curb ramps, sidewalks, drainage, signals, street lighting, signing, striping and landscaping. For the purpose of the Bidder Subcontractor List, this project includes rebar installation and electrical work. Engineer's Estimate: $10,800,000 Project Location: East Marginal Way South from 1st Ave South to Tukwila City Limits.
Open paving bids in Washington
No other open pavement overlay bids in Washington right now. Save a search for pavement overlay in Washington from the card on the left and the next one lands in your inbox on the day it posts.
Other trades in Washington: ConcreteStormwaterElectricalPick another trade
On the free plan a trade inside a state is your one specific search of the day; a plan searches every trade, every place.
Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.