Synthetic turf conversion for two Seattle playgrounds
Lower Woodland #4 and Fairmount Playground Infield Conversion, Solicitation 293434, issued by City of Seattle.
At a glance
The City of Seattle is seeking a contractor to convert clay/silt infields to synthetic turf at Lower Woodland #4 and Fairmount Playground. Work includes excavation, drainage systems, stormwater utilities, aggregate import, irrigation reconfiguration, and site restoration, with an engineer's estimate of $1.2 million.
Key facts
- Issuing agency
- City of Seattle
- Solicitation number
- 293434
- Type
- purchase
- Posted
- Aug 19, 2026
- Response deadline
- Sep 16, 2026, 5:00 PM EDT
- Place of performance
- King County, WA
Official description
Solicitation #PW#2026-012. Issued by Public Works. Project Description: Both playfield sites are existing unimproved clay/silt infield soil infields, to be converted to synthetic turf surfacing with a supplemental pad underlayment. The work includes excavation, stormwater utilities, subsurface drainage, import bulk aggregates, minor irrigation systems reconfiguration, and site restoration. The Fairmount site includes a stormwater treatment vault. Lower Woodland 4 includes a side-sewer connection. Engineer's Estimate: $1,198,227.00 Project Location: Lower Woodland #4: 1000 N 50th St Seattle, WA 98103 and Fairmount Playground Infield Conversion: 5400 Fauntleroy Way SW Seattle, WA 98103
Respond to this bid
This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.
The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.