Where
More filters
State agencies only
Set-aside / certification
Closed

Construction management services for Roosevelt Pinehurst Way NE paving project

26-015QP - AAC Roosevelt Pinehurst Way NE Project Construction (FHWA), Solicitation 261731, issued by City of Seattle.

At a glance

Seattle Department of Transportation seeks construction management staffing for an $11 million pavement preservation project on Roosevelt and Pinehurst Ways NE, including mill and overlay work, ADA improvements, and stormwater upgrades. The project runs from December 2026 through June 2028, with an estimated $2.2 million CM contract. Work includes staffing one resident engineer, two inspectors, scheduling specialist, office engineer, contract administrator, and outreach support.

Key facts

Issuing agency
City of Seattle
Solicitation number
261731
Type
purchase
Posted
Jul 22, 2026
Response deadline
Aug 19, 2026, 7:00 PM EDT
Pre-bid meeting
Jul 30, 2026, 4:00 PM EDT
Place of performance
King County, WA
  • construction management
  • pavement preservation
  • inspection
  • project administration
  • fhwa funded
  • asphalt overlay

Official description

Solicitation #26-015QP. Issued by Department of Transportation. Project Description: The City of Seattle, through Seattle Department of Transportation (SDOT), requests Statements of Qualifications, with the goal of hiring for the following key staff: 1 full time Resident Engineer, 2 full time Construction Inspectors, ¾ time Change Order/Scheduling specialist, ½ time Office Engineer, ½ Doc Control/Contract Admin, and 1 part time Outreach support to provide Construction Management (CM) services on the AAC Roosevelt Pinehurst Way NE project, as part of the overall CM team managing the construction contract for the project. AAC Roosevelt Pinehurst Way NE The AAC Roosevelt Pinehurst Way NE Project is pavement preservation work (a 2" asphalt mill & overlay) on Roosevelt Way and Pinehurst Way NE between NE 92 nd St and 15 th Ave NE. This pavement preservation project (a mill & overlay) is intended to extend the life of the existing pavement structure by 10 to 20 years. The project was awarded an $8.7M PSRC preservation grant. Scope of AAC work is typical of completed projects. Base repairs, ADA curb ramps, Stormwater Code mandated drainage improvements, striping & signal loop restoration, and the final surfacing course will all be covered by AAC. Additional improvements and funding for those will be identified during the Complete Streets planning process. Construction Contract Information Estimated construction contract value: $11 million Estimated pre-construction services (contract document review): December 2026 Estimated construction duration: December 2026 – January 2028 Estimated construction closeout: January 2028 – June 2028 Work will be accomplished in accordance with the FHWA reviewed project Plans and Specifications advertised for construction. For additional project information, please see the project website: Roosevelt and Pinehurst Way NE Paving & Safety Project - Transportation | seattle.gov The successful initiation and completion of this project are contingent on receiving federal funding.

The Seattle Department of Transportation intends to execute the consultant construction management contract in December 2026, and the contract is expected to be completed in January 2028. Completion date may be extended if additional phases are added. Construction closeout is anticipated to last six (6) months.

The City anticipates possibly awarding an initial contract amount of $2,200,000 and an initial duration of 2 years. The initial contract value and duration may be increased in varying contract dollar amounts and time. This project is anticipated to be federally funded in part through FHWA, administered in part through the Washington State Department of Transportation, and may be funded through other federal funds or Agencies.

Respond to this bid

This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.