Fire Station 20 heat pump replacement and platform

Fire Station 20 Heat Pump Replacement, Solicitation 240465, issued by City of Seattle.

At a glance

Seattle Public Works is replacing two water-to-water heat pumps at Fire Station 20 and constructing a steel-framed mechanical platform with guardrails in the apparatus bay. The project includes demolition of existing equipment, installation of new heat pumps, piping, and mechanical system modifications, with an engineer's estimate of $413,975.

Key facts

Issuing agency
City of Seattle
Solicitation number
240465
Type
purchase
Posted
Feb 25, 2026
Response deadline
Apr 1, 2026, 5:00 PM EDT
Pre-bid meeting
Mar 11, 2026, 1:00 PM EDT
Place of performance
King County, WA
  • hvac
  • heat pumps
  • mechanical systems
  • structural steel
  • fire station
  • platform construction

Official description

Solicitation #PW#2025-025. Issued by Public Works. Project Description: The work consists of constructing a steel-framed mechanical platform with metal grating and guardrails within an existing apparatus bay at Fire Station 20, including structural support for suspended mechanical equipment. The project also includes demolition of two (2) existing water-to-water heat pumps and installation of two (2) new heat pumps with associated piping and required modifications to the building’s mechanical systems. Engineer's Estimate: $413,975.00 Project Location: Fire Station 20 - 2800 15 Ave W, Seattle, WA 98119

Respond to this bid

This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.