EV charging hub installation with DC fast chargers

Haller Lake Electrical Vehicle Charging Hub, Solicitation 215510, issued by City of Seattle.

At a glance

The City of Seattle Public Works is procuring installation of three DC fast-charging stations, one Level 2 charger, transformer pad, electrical switchgear, and associated utility infrastructure at Haller Lake. The estimated project cost is $867,691, with work to be completed by December 17, 2025.

Key facts

Issuing agency
City of Seattle
Solicitation number
215510
Type
purchase
Posted
Nov 17, 2025
Response deadline
Dec 17, 2025, 5:00 PM EST
Place of performance
King County, WA
  • electrical vehicle charging
  • ev infrastructure
  • electrical installation
  • utility work
  • transformer installation
  • public works

Official description

Solicitation #PW#2024-066. Issued by Public Works. Project Description: The proposed project includes the procurement and installation of three (3) DC fast charging electrical vehicle stations, one (1) level 2 battery charger, a new transformer pad and associated work to connect to new utility service, new electrical switch gear and associated electrical equipment and underground conduits. Engineer's Estimate: $867,691.42 Project Location: 12600 Stone Ave N, Seattle, WA 98133

Respond to this bid

This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.