Strengthen and repave 200 Road Bridge at Chester Morse Lake
200 Road Bridge At Chester Morse Lake, Solicitation 176600, issued by City of Seattle.
At a glance
Seattle Public Works is soliciting bids to strengthen a bridge in the Cedar River Municipal Watershed using carbon fiber reinforced polymer composite, paint bridge piles, and repave approach transitions. The engineer's estimate is $362,000, with work occurring at a secured location behind gates.
Key facts
- Issuing agency
- City of Seattle
- Solicitation number
- 176600
- Type
- purchase
- Posted
- Jun 16, 2025
- Response deadline
- Jul 9, 2025, 5:00 PM EDT
- Pre-bid meeting
- Jun 25, 2025, 1:00 PM EDT
- Place of performance
- King County, WA
Official description
Solicitation #PW#2025-019. Issued by Public Works. PROJECT LOCATION: This Project is in the Cedar River Municipal Watershed along the 200 Road at Chester Morse Lake (LAT/ LONG: N47.40849193, W121,7219438) behind secured gates.
PROJECT DESCRIPTION: This Project consists of the following elements of Work: strengthening structural concrete elements of the 200 Road Bridge with a carbon fiber reinforced polymer composite system, painting bridge piles and repaving the bridge approach slab transitions.
ESTIMATE: The Engineer's Estimate for this Project is $362,000.
Respond to this bid
This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.
The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.