Where
More filters
State agencies only
Set-aside / certification
Closed

Drainage improvements and bioretention systems installation

2024 DRAINAGE IMPROVEMENTS, Solicitation 151376, issued by City of Seattle.

At a glance

Seattle Public Works is soliciting bids for drainage improvements at three city sites to manage stormwater runoff and prevent erosion. Work includes installing bioretention systems, replacing drainage piping, site restoration, and erosion control across Broadview, Sylvan Way, and NE 137th Street locations. The project has a $3.74 million engineer's estimate.

Key facts

Issuing agency
City of Seattle
Solicitation number
151376
Type
purchase
Posted
Mar 26, 2025
Response deadline
Apr 16, 2025, 5:00 PM EDT
Place of performance
King County, WA
  • drainage construction
  • stormwater management
  • bioretention systems
  • site restoration
  • erosion control
  • underground utilities

Official description

Solicitation #PW#2023-016. Issued by Public Works. Project Description: The purpose of the Work at the Broadview Site is to provide water quality treatment for street runoff by installing bioretention systems. This portion of the Project consists of the following elements of Work including but not limited to: construction stormwater erosion control ( submittal, implementation, and maintenance of the Construction Stormwater Pollution Prevention plans (CSECP/SWPPP, TVSPP, SP, & TDP)); health and safety plan; clearing and grubbing; demolition and removal of existing surface pavement, sidewalks, and curbs; potholing; excavation; temporary traffic control plan and implementation, including flagging; site preparation and staging; survey; removal and abandoning of existing drainage structures and piping; temporary stormwater bypass; protection, relocation, and/or adjustments of existing utilities, including water services; reconnection to the existing drainage system; installation of new drainage systems, including storm drainage piping, drainage structures, bioretention cells, and flow splitters; flow testing; install gate valves and assist SPU crews with water service and meter box relocations/adjustment; television inspections; side sewer reconnections; and final site restoration, including surface paving, pavement markings, permanent signing and posts, sidewalks, curbs, driveways, curb ramps, planting, and landscape establishment.

The purpose of the Work at the Sylvan Site is to provide water quality treatment for street runoff that drains to Longfellow Creek by retrofitting the roadside with bioretention treatment system. This portion of the Project consists of the following elements of Work including but not limited to: construction stormwater erosion control (submittal, implementation, and maintenance of the Construction Stormwater Pollution Prevention plans (CSECP/SWPPP, TVSPP, SP, and TDP)); health and safety plan; clearing and grubbing; demolition and removal of existing surface pavement and curbs; potholing; excavation; temporary traffic control plan and implementation, including flagging; site preparation and staging; survey; removal and abandoning existing drainage structures and piping; well decommissioning; temporary shoring and dewatering; temporary stormwater bypass; protection, relocation, and/or adjustments of existing utilities; reconnection to the existing drainage system; installation of new surface drainage systems, including: storm drainage piping, drainage structures, and bioretention cell; gutter flow testing; television inspections; and final site restoration, including: surface paving, curbs, soil amendments, planting, landscaping and establishment.

The purpose of the Work at the NE 137 th Headwall site is to improve debris collection as well as to reduce erosion and sedimentation that threatens the roadway embankment, neighboring properties, and fish habitat. This portion of the Project consists of the following elements of Work including but not limited to: construction stormwater erosion control (submittal, implementation, and maintenance of the Construction Stormwater Pollution Prevention plans (CSECP, TVSPP, SP, and TDP)); health and safety plan; clearing and grubbing; potholing; excavation; temporary traffic control plan and implementation including flagging; site preparation and staging; survey; temporary stream bypass; installation of a steel soldier pile headwall with concrete panels and a new trashrack at the upstream end a 36-inch-diameter concrete culvert beneath the roadway; removal and re-installation of existing guardrail as necessary to do the work; new guardrail; and site restoration and planting. Engineer's Estimate: $3,737,500 Project Location: This Project is located at 3 distinct sites within the City of Seattle: The Broadview Site includes 2 locations in the Broadview neighborhood: 1) Along NW 130th St between 1st Ave NW and 3rd Ave NW and 2) Along NW 127th Street from 3rd Ave NW and then south along 1st Ave NW.

The Sylvan Site is located at the Sylvan Way SW and SW Orchard St intersection which is within the Longfellow Creek basin.

The NE 137 th St Culvert Headwall Site is located on NE 137 th Street between 30 th Ave NE and 32 nd Ave NE.

Respond to this bid

This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.