CSO and Hampton Pump Station Gate and Controls Improvements
CSO 019A, CSO 19B, and Hampton St Pump Station Improvements, Solicitation 168709, issued by City of Richmond.
At a glance
The City of Richmond's Public Utilities department seeks a contractor to demolish existing gates at two Combined Sewer Overflow facilities, install actuated slide gates and control systems, replace level transmitters and flow meters with specified equipment, and install a new Motor Control Center and Programmable Logic Control System at Hampton Pump Station.
Key facts
- Issuing agency
- City of Richmond
- Solicitation number
- 168709
- Type
- purchase
- Posted
- May 13, 2025
- Response deadline
- Jun 18, 2025, 11:00 AM EDT
- Pre-bid meeting
- May 29, 2025, 10:00 AM EDT
- Place of performance
- City of Richmond, VA
Official description
Solicitation #IFB 250012795. Issued by Public Utilities. The Work on the Project will include: A. Demolition of existing gates at CSO 019A and CSO 019B, B. Furnishing and installing actuated slide gates and instrumentation and control components within the CSO 19A Regulator and Hampton Pump Station, C. Furnishing and installing a new Motor Control Center ("MCC") at the Hampton Pump Station, D. Replacing all the level transmitters at Hampton Pump Station and CSO 19B with Siemens Hydroranger 200 HMI, 1. Installing their connections to the new Programmable Logic Control System ("PLC"). E. Replacing the flow magmeters at the Hampton Pump station and CSO 19B with Toshiba Model LF654, and F. Furnishing and installing a new PLC at the Hampton Pump Station.
Respond to this bid
This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.
The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.