Wastewater pump station fan and VFD replacements
MBWTP and KMLWTP Fan Replacements and VFD Upgrades, Solicitation 94440, issued by City of Norfolk.
At a glance
Norfolk Utilities is seeking a contractor to replace 10 roof fans and 4 air intakes at Moores Bridges Intermediate Pump Station, plus upgrade variable frequency drives (250 hp at Moores Bridges, 200 hp at Kristen M. Lentz WTP). This is specialized industrial HVAC and electrical equipment work at municipal water treatment facilities.
Key facts
- Issuing agency
- City of Norfolk
- Solicitation number
- 94440
- Type
- purchase
- Posted
- May 15, 2024
- Response deadline
- Jun 20, 2024, 3:00 PM EDT
- Pre-bid meeting
- May 29, 2024, 10:00 AM EDT
- Place of performance
- City of Norfolk, VA
Official description
Solicitation #2021-UTL-0012-??. Issued by Utilities. The Work under this Project consists of the replacement of ten roof fans at the Moores Bridges Intermediate Pump Station along with the replacement of four air intakes. The work includes replacement of four 250 hp variable frequency drives (and associated minor control system modifications) at the Moores Bridges WTP Intermediate Pump Station and replacement of four 200 hp variable frequency drives at the Kristen M. Lentz WTP Intermediate Pump Station.
Respond to this bid
This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.
The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.