Closed

Water treatment plant pump system modifications and controls upgrade

Moores Bridges Water Treatment Plant HPPS No. 2 Modifications, Solicitation 5513, issued by City of Norfolk.

At a glance

Norfolk Utilities is upgrading the Moores Bridges Water Treatment Plant by replacing two 1500 hp pumps with four 1000 hp pumps, installing variable frequency drives, building an enclosed electrical controls room with independent HVAC systems, and adding surge tanks with yard piping connections. This is a closed solicitation.

Key facts

Issuing agency
City of Norfolk
Solicitation number
5513
Type
purchase
Posted
Oct 20, 2020
Response deadline
Nov 25, 2020, 3:00 PM EST
Place of performance
City of Norfolk, VA

Official description

Solicitation #HPPS #2 - Mod.. Issued by Utilities. Demolishment of two existing 1500 hp pumps and a hydropneumatic surge protection system. Installation of four 1000 hp pumps and associated pump control valves, check valves, and fittings. Installation of new vfd’s for existing two 1500 hp pumps and four 1000 hp pumps. Conversion of existing electrical space to enclosed temperature controlled electrical controls room. Installation of six independent multi-unit HVAC systems. Installation of two surge tanks and associated auxiliary systems, yard piping connections of large diameter piping to connect to surge system.

Respond to this bid

This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.