St. Paul's Blue-Greenway stormwater infrastructure construction
St. Paul's Blue-Greenway - Stormwater Phase, Solicitation 19263, issued by City of Norfolk.
What this job goes for
IntelligenceVirginia stormwater bid results, every bidder’s price, Nov 2024 to Aug 2026.
Unit prices for this job’s items
- OUTLET PIPE · per lin ftBids usually run (the middle of 47 jobs). Most fall between and .
- FRAME & COVER MH-1 · per eachBids usually run (the middle of 44 jobs). Most fall between and .
- MANHOLE MH-1 OR 2 · per lin ftBids usually run (the middle of 43 jobs). Most fall between and .
- EROSION CTRL. STONE CL. I, EC-1 · per tonBids usually run (the middle of 41 jobs). Most fall between and .
- ROLLED EROSION CTRL PRODUCT EC-2 TYPE 1 · per sq ydBids usually run (the middle of 39 jobs). Most fall between and .
- UNDERDRAIN UD-4 · per lin ftBids usually run (the middle of 37 jobs). Most fall between and .
- ENDWALL EW-12 · per eachBids usually run (the middle of 34 jobs). Most fall between and .
- 15" STORM SEWER PIPE · per lin ftBids usually run (the middle of 33 jobs). Most fall between and .
And 110 more items.
The job
The City of Norfolk is seeking construction services for the St. Paul's Blue-Greenway Stormwater Phase, which involves daylighting 1,200 linear feet of box culvert, excavation, drainage systems, retaining structures, a pedestrian bridge, and site restoration. Work includes erosion controls and deep foundations. Bid due December 14, 2026.
- Trade
- Storm drainage, culverts, erosion
- Also includes
- Bridges; Site work, excavation, grading; Concrete, sidewalk, curb
- Kind of work
- Daylighting of box culvert, excavation, active-flow management, deep foundations, retaining structures, pedestrian bridg
- The work
- New construction or installation
- Contract
- One job
- Size
- 1,200 linear ft, as the posting states it
- Who can bid
- Any qualified firm.
- Issuing agency
- City of Norfolk
- Solicitation number
- 19263
- Portal id
- 308994
- Type
- purchase
- Posted
- Oct 15, 2026
- Response deadline
- Dec 18, 2026, 4:00 PM EST
- Pre-bid meeting
- Nov 4, 2026, 9:00 AM EST
- Questions due
- Nov 20, 2026, 4:00 PM EST
- Place of performance
- City of Norfolk, VA
Official posting
Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).
Official description
Solicitation #19263. Issued by Public Works (D&C). The St. Paul's Blue-Greenway Stormwater Phase includes daylighting of approximately 1,200 linear feet of existing box culvert, excavation, active-flow management, deep foundations, retaining structures, a pedestrian bridge, drainage work, erosion and sediment controls, and restoration.
Open stormwater bids in Virginia
- OpenDue Nov 16, 2026
- OpenDue Nov 18, 2026
- OpenDue Dec 11, 2026
- OpenDue Dec 15, 2026
- Open
Other trades in Virginia: BridgesSite workConcretePick another trade
On the free plan a trade inside a state is your one specific search of the day; a plan searches every trade, every place.
Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.