Where
More filters
State agencies only
Set-aside / certification
ClosedSet-aside: 8A

Fort Lee Vehicle Recovery Range

Fort Lee Vehicle Recovery Range, Solicitation W9123626BA006, issued by Federal (Virginia offices).

Key facts

Solicitation number
W9123626BA006
Portal id
2c440f74f46244f0a40450f017ac7288
Type
Solicitation
Posted
Sep 29, 2026
Response deadline
Sep 29, 2026, 2:00 PM EDT
Place of performance
Fort Lee, VA
Set-aside
8(a) Set-Aside (FAR 19.8)
Official posting
Documents, addenda and the procurement contact, free with an account.

Respond to this bid

This solicitation is administered by the issuing agency through SAM.gov, the federal contracting system. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.

Official description

Note: An Amendment 7 will be published today 29SEP to extend bids due date. Amendment 0006: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0006. This amendment incoporates the revised solicitation documents dated August 31, 2026 in response to bidder inquiries. This amendment does not extend the bid due date and bid opening date. Please see the amendment for the complete summary of changes. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.

Solicitation #W9123626BA006. Issued by DEPT OF DEFENSE › DEPT OF THE ARMY › W2SD ENDIST NORFOLK. NAICS 236220. Product/Service Code Y1PZ.

Why this bid is on SledAtlas

We read every Virginia source we have, and federal work performed in Virginia, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.