1200 W Sewer Trunk Line Rehabilitation – 1300 South
1200 W Trunk Line Rehabilitation – 1300 South, Solicitation 248870, issued by Salt Lake City.
At a glance
Salt Lake City is rehabilitating approximately 6,386 linear feet of 48–60-inch diameter sewer trunk line along 1300 South using water-cured CIPP technology, including manhole epoxy coating, bypass pumping systems, lateral reconnection, and post-construction testing. The contractor must coordinate permitting with multiple agencies (Salt Lake City, UDOT, UPRR, UTA), manage groundwater, and handle public outreach. Project deadline is September 30, 2026.
Key facts
- Issuing agency
- Salt Lake City
- Solicitation number
- 248870
- Posted
- Aug 13, 2026
- Response deadline
- Sep 30, 2026, 4:00 PM EDT
- Place of performance
- Salt Lake County, UT
Official description
Issued by CITIES - Salt Lake City Corporation. Reference #525003129. Work under this Rehabilitation Project will take place within a portion of the City’s 1200 W sewer trunk line located along 1300 S, from State Street to 700 West.
The Work generally includes, but is not limited to, the following: • Water-cured CIPP Rehabilitation of approximately 6,386 LF of 48-inch, 54-inch, and 60-inch diameter RCP trunk line. • Furnishing, installation and uninterrupted maintenance/oversight of a flow control bypass pumping system of the trunk line, including odor control, tributary and sewer service lateral connections. • Groundwater management as required for CIPP and manhole rehabilitation, including any treatment, handling and disposal in accordance with applicable permits and regulations. • Permitting with Salt Lake City Right of Way and Traffic Control, UDOT, UPRR, and UTA. • Rehabilitation of 16 manholes with an epoxy coating system. • Cleaning, video inspection of the existing trunk line, location of existing active laterals and completion of all necessary spot repairs for CIPP rehabilitation. • Reconnection of all active laterals and disconnection of inactive laterals to the rehabilitated trunk line. • Completion of post construction testing and video inspection of the rehabilitated trunk line and manholes. • Coordinating with other agencies and performing public relations and outreach activities during construction. Project closes Sep 30, 2026 2:00 PM MDT.
Respond to this bid
This solicitation is administered by the issuing agency through its Bonfire procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.
The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.