OpenResponses due Sep 28, 2026, 2:00 AM EDT

Paved pathway maintenance: crack seal, seal coat, striping

Paved Pathway Maintenance – Crack Seal, Mastic, Seal Coat and Striping, Solicitation 255198, issued by Grand County.

At a glance

Grand County, Utah is seeking qualified contractors to perform pavement preservation on approximately 10.5 miles of paved pathways in three corridors: Moab Canyon, Colorado River, and Lions Park perimeter. Work includes crack sealing, mastic repair, surface prep, dual seal-coat applications with traction agent, and striping on an estimated 800,000 square feet, with all labor, materials, equipment, and traffic control included.

Key facts

Issuing agency
Grand County
Solicitation number
255198
Posted
Sep 21, 2026
Response deadline
Sep 28, 2026, 2:00 AM EDT
Place of performance
Grand County, UT

Official description

Issued by COUNTIES - Grand County. Reference #GC10030. Grand County, Utah is soliciting proposals from qualified contractors to perform pavement preservation and maintenance on approximately 10.5 miles of paved pathway within the following corridors:

Moab Canyon Corridor, Colorado River Corridor, and Lions Park perimeter pathway.

The work generally consists of crack sealing, wide-crack mastic repair, surface preparation, 2 applications of seal coat with a traction agent, and pavement striping. Pavement striping will encompass the entire pathway, concrete sections included (concrete section repair/refurbishment is not considered in the RFP).

The County's estimated seal-coat area is 800,000 square feet. The estimated quantities for crack sealant, mastic, and striping are provided for bidding and comparison purposes. Contractors shall verify existing conditions and quantities during their site inspection.

The successful contractor shall furnish all labor, supervision, materials, equipment, transportation, traffic control, cleanup, and incidentals necessary to complete the work in accordance with this Scope of Work.

All proposed prices shall be Not-to-Exceed amounts for completion of the entire project.

For.kml files associated with the Colorado River Bike Path and the Moab Canyon Pathway, email a request to (on the official posting). Project closes Sep 28, 2026 12:00 AM MDT.

Respond to this bid

This solicitation is administered by the issuing agency through its Bonfire procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.