Load, haul, and dump 630 cubic yards of rock
AM27-125 Upper Sevier River Rock – 2026, issued by State of Utah.
The job
Utah Division of Wildlife Resources seeks a contractor to load, haul, and dump 630 cubic yards of 3-5 feet diameter rock in Garfield County. Mandatory site visit required November 18, 2026. Project deadline is November 25, 2026.
- Issuing agency
- State of Utah
- Solicitation number
- AM27-125
- Portal id
- 261238
- Posted
- Nov 4, 2026
- Response deadline
- Nov 25, 2026, 4:00 PM EST
- Place of performance
- Garfield County, UT
Official posting
Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).
Official description
Issued by Division of Purchasing. Reference #AM27-125. Issuing Procurement Unit: State of Utah Division of Purchasing Conducting Procurement Unit: Division of Wildlife Resources
The purpose of this IFB is to enter into a contract to provide: to load, haul, and dump 630 cubic yards of 3-5 feet diameter rock in Garfield County. Mandatory Site Visit: November 18th, 2026 at 10:00 am at the Losee Canyon turn off from SR-12 (37°44'43.6"N 112°20'30.4"W)
https://maps.app.goo.gl/m3y7nt7Zhq6LNhPw9
It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor.
The methodology or formula that will be used to determine the number of contract awards is: Lowest Cost.
Vendor must guarantee its pricing for duration of the project. Project closes Nov 25, 2026 2:00 PM MST.
Open bids like this one
- OpenDue Nov 17, 2026
- OpenDue Nov 19, 2026
- OpenDue Dec 1, 2026
- OpenDue Dec 1, 2026
- Open
Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.