Construction manager for generators and HVAC replacements
RFP for CMR for TSBVI GENERATORS AND HVAC REPLACEMENTS, Solicitation 262469, issued by Texas Facilities Commission.
At a glance
Texas Facilities Commission seeks a Construction Manager-at-Risk to oversee $7 million in generator and HVAC system replacements at the Texas School for the Blind and Visually Impaired in Austin. Work includes backup power systems for four buildings, 32 rooftop HVAC units, split-system units, and five water heaters. Project timeline: 120-day pre-construction phase followed by approximately 360-day construction period.
Key facts
- Issuing agency
- Texas Facilities Commission
- Solicitation number
- 262469
- Type
- purchase
- Posted
- May 4, 2026
- Response deadline
- May 27, 2026, 4:00 PM EDT
- Pre-bid meeting
- May 12, 2026, 11:00 AM EDT
- Questions due
- May 18, 2026, 1:00 PM EDT
- Place of performance
- Travis County, TX
- Official posting
- Documents, addenda and the procurement contact, free with an account.
Respond to this bid
This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.
The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.
Official description
Solicitation #RFP 0008612. Issued by Facilities Design & Construction. SCOPE: In accordance with the provisions of Texas Government Code, Chapter 2269, Subchapter F, Construction Manager-at-Risk Method, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is requesting qualifications for a Construction Manager-at-Risk (CMR) to perform the work required for Texas School for the Blind and Visually Impaired (TSBVI) Generators and HVAC Replacements. The Generators are added for whole or partial back-up of non-Life Safety, but necessary power generation for long-term power outages in four (4) priority buildings, three (3) of which are intended to be used as Shelter-in-Place buildings to accommodate the comfort and safety of live-in students during these periods of time. The fourth (4 th ) building upgrades the backup equipment already in place for the operations of the campus. This project also replaces thirty-two (32) Roof-top Aaon HVAC units on ten (10) buildings (assorted tonnages), eight (8) split-system HVAC units on Building 610 and three (3) split-system HVAC units on Building 509. Five (5) water heaters in five different buildings are also included. This work will hereinafter be described as TFC Project #25-005-4201 & 2567 (the Project). The TSBVI campus is located at 1100 W 45th St, Austin, TX 78756. This Project will be administered by TFC. This procurement will be a one-step award process with a two-part work requirement. COST OF WORK: Respondents to the RFP should consider the “Cost of Work” as seven million dollars ($7,000,000.00), not including any Pre-construction Management fees, Construction Management fees, and Construction General Conditions CONTRACT TERM: Construction is required to commence within twenty-one (21) calendar days after the Notice to Proceed for Construction is issued. For planning purposes, the pre-construction time period is estimated to be one-hundred twenty (120) calendar days. The construction contract period is projected for a term of three hundred sixty (360) calendar days which should include lead time on equipment manufacture and delivery, but may be otherwise be amended or negotiated by TFC to suit the School calendar and minimize the disruption of the students
Open bids like this one
This one has closed, but there are 17 open construction management bids in Texas right now. Save a search for construction management from the card on the left and the next one lands in your inbox on the day it posts.
- OpenDue Oct 7, 2026
- OpenDue Oct 9, 2026
- OpenDue Oct 13, 2026
- OpenDue Oct 14, 2026
- OpenDue Oct 15, 2026
Why this bid is on SledAtlas
We read every Texas source we have, and federal work performed in Texas, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.