ASR pilot facility surface infrastructure construction

ASR Demonstration Study—Surface Facilities (ASRSF), Solicitation 148149, issued by Tarrant Regional Water District.

At a glance

Tarrant Regional Water District seeks construction proposals for surface facilities supporting an Aquifer Storage and Recovery (ASR) demonstration project at a Trinity River Authority facility. Work includes piping/infrastructure (Package 1) and electrical/instrumentation systems (Package 2); contractors may bid one or both packages. Substantial completion required by December 31, 2026.

Key facts

Solicitation number
148149
Type
purchase
Posted
Feb 20, 2025
Response deadline
Mar 19, 2025, 2:00 PM EDT
Pre-bid meeting
Mar 6, 2025, 10:00 AM EST
Questions due
Mar 12, 2025, 6:00 PM EDT
Award expected
Apr 15, 2025, 3:44 PM EDT
Place of performance
Tarrant County, TX
Official posting
Documents, addenda and the procurement contact, free with an account.
  • water infrastructure
  • aquifer storage recovery
  • pilot construction
  • piping systems
  • electrical systems
  • instrumentation

Respond to this bid

This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.

Official description

Solicitation #25-062. Issued by Infrastructure Engineering. The Tarrant Regional Water District (Owner) is requesting Proposals for the construction of the following Project: ASR Demonstration Study—Surface Facilities (ASRSF) CSP 25-062 The Project consists of construction of a pilot facility designed to study the long-term feasibility of Aquifer Storage and Recovery (ASR) at an existing facility operated by the Trinity River Authority. Construction of the well was completed in 2024, and this project consists of construction of the facilities piping and infrastructure (Package 1), and the electrical and instrumentation systems (Package 2) associated with the pumps and associated equipment to be provided and installed by the well contractor, Hydro Resources Mid Continent Inc. (Package 3). Contractors are invited to submit proposals for either or both Work Packages. The Owner's Budget for the Project is $3,541,128. The Project is to be Substantially Complete and ready for operation on or before December 31, 2026. The Project is to be complete and eligible for Final Payment 30 days after the date for Substantial Completion.

Open bids like this one

This one has closed, but there are 11 open water infrastructure bids nationwide right now. Save a search for water infrastructure from the card on the left and the next one lands in your inbox on the day it posts.

Why this bid is on SledAtlas

We read every Texas source we have, and federal work performed in Texas, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.