RFP #26-018: Server Room Enclosure & Infrastructure Upgrades, issued by Tarrant County College District.
What this job goes for
IntelligenceTexas building renovation bid results, every bidder’s price, Aug 2025 to Feb 2026.
Unit prices for this job’s items
- Contingency: This item to be used only for authorized extra work that is approved by the City of Plano. · per dolBids usually run (the middle of 5 jobs). Most fall between and .
The job
Tarrant County College District is seeking proposals for a lump-sum renovation of about 4,070 square feet of data center space at its Trinity River Campus in Fort Worth. Work includes fire-rated enclosures, new CRAH cooling units, chilled-water piping, controls, fire suppression and electrical, while the data center stays operating. Proposals are due November 25, 2026.
- Trade
- Building renovation and general construction
- Also includes
- HVAC; Electrical and lighting; Fire alarm and sprinklers; Cameras, access control, cabling, audio-visual; Carpentry, drywall, ceilings, casework; Welding, metal fabrication, railings
- Kind of work
- Data center server room enclosure and MEP upgrades
- The work
- Renovation
- Contract
- One job
- Size
- 4,070 sq ft, as the posting states it
- Who can bid
- Any qualified firm.
- Issuing agency
- Tarrant County College District
- Solicitation number
- RFP #26-018
- Portal id
- 259642
- Type
- RFP
- Posted
- Oct 21, 2026
- Response deadline
- Nov 25, 2026, 3:00 PM EST
- Place of performance
- Tarrant County, TX
Official posting
Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).
Official description
Reference #RFP #26-018. Description: Tarrant County College District is soliciting proposals for RFP #26-017, Data Center Enclosure & MEP Upgrades, located at the TCC Trinity River Campus, 300 Trinity Campus Circle, Fort Worth, Texas 76102, Building ID TCRF (Clear Fork). The project consists of renovations and system upgrades to the existing data center/server-room area. The construction documents identify an approximate 4,070-square-foot renovation area.
The work is anticipated to be performed under one lump-sum construction contract and includes all labor, materials, equipment, supervision, coordination, and incidentals necessary to complete the project as shown and specified in the Contract Documents. The scope includes selective demolition; modifications to the existing raised access floor; new demountable fire-rated enclosure construction and welded-wire security partitions; doors, hardware, ceilings, finishes, signage, and firestopping; and modifications to access control, security, and related technology systems.
The work also includes substantial MEP upgrades, including removal of existing computer-room air-conditioning equipment and installation of new CRAH units; chilled-water piping, condensate and domestic-water connections; BAS controls and integration; modifications to fire suppression, VESDA smoke detection, FM-200/clean-agent systems, and fire alarm systems; electrical distribution and equipment connections; lighting and lighting controls; and reconfiguration of the emergency-power-off systems. Construction must be coordinated so that the operating data center remains functional, including maintaining the required cooling capacity during the work and implementing specified dust containment, negative-air, and HEPA filtration measures. Project closes Nov 25, 2026 2:00 PM CST.
Open building renovation bids in Texas
- OpenDue Nov 16, 2026
- OpenDue Nov 17, 2026
- OpenDue Nov 17, 2026
- OpenDue Nov 18, 2026
- OpenDue Nov 18, 2026
Other trades in Texas: HVACElectricalFire protectionPick another trade
On the free plan a trade inside a state is your one specific search of the day; a plan searches every trade, every place.
Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.