Where
More filters
State agencies only
Set-aside / certification
Closed

Landscape hardscape improvements on state highway and university boulevard

Landscape Hardscape Improvements, Solicitation 292252, issued by City of Sugar Land.

At a glance

The City of Sugar Land is seeking a contractor to perform landscape and hardscape improvements along State Highway 6 and University Boulevard. Work includes installation, cleanup, and restoration of landscaping and irrigation systems, with no overnight lane closures permitted. The project requires Traffic Control Plan approval from TxDot and contractor responsibility for utility locates and equipment staging.

Key facts

Issuing agency
City of Sugar Land
Solicitation number
292252
Type
purchase
Posted
Aug 19, 2026
Response deadline
Sep 3, 2026, 12:00 PM EDT
Questions due
Aug 27, 2026, 4:00 PM EDT
Answers posted
Aug 28, 2026, 4:00 PM EDT
Place of performance
Fort Bend County, TX
Official posting
Documents, addenda and the procurement contact, free with an account.
  • landscaping
  • hardscape
  • excavation
  • traffic control
  • public works

Respond to this bid

This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.

Official description

Solicitation #2026-ITB-039. Issued by Public Works - Right of Way Maintenance. Landscape Hardscape Improvement Project

Contract quantities are estimated and are for the purpose of establishing a contract budget and evaluating bid proposals. It is the City’s intent to utilize all budgeted contract funds, however the quantity of unit work items may vary dependent on the City’s needs. Work Locations are State Highway 6 and University Blvd. All locations will be marked and verified by City Staff prior to work commencing. Measuring device to be used to verify measurements is a Trimble R580 Centimeter System. Contractor is responsible for daily clean up of all waste materials. No overnight lane closures allowed. Contractor is responsible for the restoration of all damaged landscaping or irrigation to original condition. A Traffic Control Plan Request Form will need to be submitted to TxDot and approved prior to work commencing. Equipment staging area is not provided during the project. Contractor is responsible for 811 Locates for work locations. Construction details for this project included in the bid packet. Full set of Construction Details can be found https://www.sugarlandtx.gov/263/Standards-Permits City of Sugar Land Standard Specification Included as an attachment. A site visit is recommended; see the map attached.

Open bids like this one

This one has closed, but there are 5 open landscaping bids in Texas right now. Save a search for landscaping from the card on the left and the next one lands in your inbox on the day it posts.

Why this bid is on SledAtlas

We read every Texas source we have, and federal work performed in Texas, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.