Surface water treatment plant rehab phase 1

Surface Water Treatment Plant Rehab Phase 1, Solicitation 277498, issued by City of Sugar Land.

At a glance

Sugar Land is upgrading its Surface Water Treatment Plant with new chemical metering and transfer systems, chlorine dioxide generation equipment, piping replacements, protective coatings, and safety improvements. The contractor will demolish existing systems, install modern pumps and controls with VFDs, upgrade chemical containment and ventilation, and maintain plant operations during construction.

Key facts

Issuing agency
City of Sugar Land
Solicitation number
277498
Type
purchase
Posted
Jul 1, 2026
Response deadline
Aug 6, 2026, 3:00 PM EDT
Pre-bid meeting
Jul 14, 2026, 10:00 AM EDT
Questions due
Jul 24, 2026, 3:00 PM EDT
Answers posted
Jul 30, 2026, 6:00 PM EDT
Place of performance
Fort Bend County, TX
Official posting
Documents, addenda and the procurement contact, free with an account.
  • water treatment
  • chemical systems
  • pumps and piping
  • protective coatings
  • hvac and ventilation
  • electrical controls

Respond to this bid

This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.

Official description

Solicitation #CIP 2026-005. Issued by Engineering. Work for this contract is for the modification and rehabilitation of the existing Surface Water Treatment Plant. The project includes all work as shown and specified on the Drawings and as shown in the Technical Specifications. In summary, the work includes: Mobilization, bonds, and insurance by the Contractor to initiate project start-up, as specified in Contract Documents. Proposed improvements as shown on the Drawings and specified herein. Chemical Metering Pumps Improvements Demolish and remove existing chemical feed pumps, piping, fittings, calibration column and associated electrical and control components associated with the following chemical feed applications. Install new 12.5% sodium hypochlorite dosing pumps skids for granular activated carbon (GAC) backwash including pumps, piping, fittings, calibration column, flow meter and integral variable frequency drive (VFD) and controls. Install new 12.5% sodium hypochlorite dosing pumps skids for Post-Chemical mixing including pumps, piping, fittings, calibration column, flow meter and integral VFD and controls. Install new 25% sodium hydroxide (caustic) dosing pumps skids for Post-Chemical mixing including pumps, piping, fittings, calibration column, flow meter and integral VFD and controls, and coating inside the room. Install new 40% liquid ammonium sulfate (LAS) dosing pumps skids for Post-Chemical mixing including pumps, piping, fittings, calibration column, flow meter and integral VFD and controls, and coating inside the room. Install new polyaluminum chloride (PACL) dosing pumps skids including pumps, piping, fittings, calibration column, flow meter and integral VFD and controls, and coating inside the room. New chemical protective coating inside the Liquid Ammonium Sulfate (LAS), chlorine dioxide, caustic soda, sodium hypochlorite and Polyaluminum chlorite (PACL) feed rooms and bulk storage areas. Associated electrical, instrumentation and control improvements. Chemical Transfer Pumps Piping Improvements Demolish and remove existing chemical transfer pump piping and fittings. Install new piping within the chemical feed building for the sodium hypochlorite and caustic transfer pumps.

Chlorine Dioxide System Improvements Install a temporary mobile unit to generate chlorine dioxide solution onsite using a two-chemical system during the construction phase to maintain plant disinfection operation. Demolish existing two (2) on-site generators inside the existing chlorine dioxide room, including two (2) batch tanks, one (1) sodium hypochlorite day tank, one (1) hydrochloric acid (HCA) day tank, and four (4) peristaltic metering pumps. Install new two-chemical system inside the chlorine dioxide room, including generator units, Purate day tanks, and distribution panels. Construct a new secondary containment for sulfuric acid bulk storage tank with a new unloading station. Construct a new secondary containment for Purate bulk storage tank with a new unloading station. Demolish existing HCA bulk storage tank and two (2) HCA transfer pumps and associated piping, valves and fittings. Demolish existing sodium chlorite (SC) storage tank and two(2) SC metering pumps and one(1) day tank and associated piping, valves and fitting. Demolish two (2) sodium hypochlorite transfer pumps and associated piping and fittings inside the existing sodium hypochlorite room. Remove and replace existing PVC piping with CPVC piping. Install new chemical protective coating to the chlorine dioxide room, sulfuric acid bulk storage tank containment and Purate bulk storage tank containment. Associated structural, building mechanical, electrical, instrumentation and control, and site civil improvements.

Membrane Building Piping Replacement Remove and replace sodium hypochlorite and caustic piping with fusible polyethylene piping within the Membrane Building including valves and appurtenances.

Chemical Protective Coating Improvements Remove existing coating and install new chemical protective coating inside chemical bulk storage tank containments and chemical unloading stations. Regrout chemical containment to properly drain to containment sumps. Regrout the unloading station to repair current damage. Chemical Ventilation, Emergency Shower and Eyewash Station Improvements Remove all existing outdoor safety showers and replace with new freeze-proof rated outdoor showers. Install the outdoor showers on a small elevated concrete pad. Remove all existing indoor safety showers in the chemical facility and replace with new standard safety showers. Install a tepid water system with insulated and heat traced piping for safety shower system. Building ventilation improvements in membrane CIP room.

Open bids like this one

This one has closed, but there are 4 open water treatment bids in Texas right now. Save a search for water treatment from the card on the left and the next one lands in your inbox on the day it posts.

Why this bid is on SledAtlas

We read every Texas source we have, and federal work performed in Texas, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.