Where
More filters
State agencies only
Set-aside / certification
Closed

Water plant generator and drive maintenance installation

CWA2406/2409: GROUNDWATER PLANT GENERATOR & RIGHT ANGLE DRIVE (RAD) MAINTENANCE PROGRAM, Solicitation 259104, issued by City of Sugar Land.

At a glance

City of Sugar Land is seeking contractors to install new diesel generators, automatic transfer switches, and fuel management systems at multiple water plants, including site preparation with concrete work, equipment removal, and final grading. Work includes major improvements at Sugar Creek and First Colony plants plus miscellaneous upgrades across 12 additional facilities. Project requires coordination with owner-selected SCADA integrator.

Key facts

Issuing agency
City of Sugar Land
Solicitation number
259104
Type
purchase
Posted
May 6, 2026
Response deadline
Jun 4, 2026, 12:00 PM EDT
Pre-bid meeting
May 14, 2026, 12:00 PM EDT
Questions due
May 21, 2026, 6:00 PM EDT
Answers posted
May 28, 2026, 6:00 PM EDT
Place of performance
Fort Bend County, TX
Official posting
Documents, addenda and the procurement contact, free with an account.
  • generator installation
  • water utilities
  • diesel equipment
  • concrete work
  • electrical systems
  • site preparation

Respond to this bid

This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.

Official description

Solicitation #2026-ITB-022. Issued by Engineering. BRIEF SCOPE OF WORK Major Improvements: Sugar Creek Water Plant: For Sugar Creek Water Plant, the scope of work includes the installation of a new diesel generator with a base fuel tank, along with a Service entrance rated Automatic Transfer Switch (ATS) and a dual-purpose docking station. The contractor shall also furnish and install a new incoming service bus weatherhead per CenterPoint Energy Standards, including all required supports, fittings, terminations, and weatherproofing/sealing, and shall coordinate any and all required outage and service reconnection to provide a complete, code-compliant service entrance installation. The contractor will be responsible for preparing the site, which includes constructing new concrete foundations, slabs, platforms, grating, and handrails as required. The contractor will handle the removal of any existing equipment and the demolition of old concrete pads. Once the new equipment is in place, the contractor will perform final site grading to ensure the site is properly prepared and completed according to specifications. Additionally, final site grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals required to complete the work as specified. PLC/SCADA programming and modification to owner facilities will be performed by owner pre-selected SCADA integrator (Prime Controls). First Colony Water Plant: For First Colony Water Plant, the scope of work includes the rehabilitation of the existing Automatic Transfer Switch (ATS) and the installation of a new diesel generator, sub-base fuel tank, along with a proposed dual-purpose docking station. The contractor will be responsible for preparing the site, which includes constructing new concrete foundations, slabs, platforms, grating, and handrails as required. Additionally, final site grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals required to complete the work as specified. The contractor will handle the removal of any existing equipment and the demolition of old concrete pads. Once the new equipment is in place, the contractor will perform final site grading to ensure the site is properly prepared and completed according to specifications. Additionally, final site grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals required to complete the work as specified. SCADA programming and modification to owner facilities will be performed by owner pre-selected SCADA integrator (Prime Controls). Miscellaneous Improvements: The miscellaneous improvements include the following items: Installation of New Diesel Fuel Management Systems Rust Prevention, Painting, and Protective Coatings Repairs to existing Fuel Storage Tanks Before commencing any miscellaneous improvement tasks, a site visit should be conducted at each facility to verify the scope of work. Existing conditions may differ from those when the project scope was initially developed. This visit will be coordinated with the Owner's designated representative to assess the site and confirm the feasibility of the proposed improvements. The objectives of the site visit include: Verifying the physical space and layout. Ensuring all necessary infrastructure and utilities are available. Identifying potential challenges that may arise during installation. Discussing any required modifications or special considerations for the initial design or installation plan. The water facilities where the proposed miscellaneous improvements should be implemented are summarized below. S. No Water Facility Address

Surface Water Plant 14601 Voss Road, Sugar Land, TX 77498

Woodchester 13743 Woodchester, Sugar Land, TX 77498

Lakeview 1101 Lakeview Drive, Sugar Land, TX 77478

Sugar Creek Water Well Pump Right Angle Drive 2030 Country Club Blvd, Sugar Land, TX 77478

Austin Parkway 1402 Austin Parkway, Sugar Land, TX 77479

Riverstone 16802 1/2 University Blvd., Sugar Land, TX 77479

Riverpark 5975 Summit Creek, Sugar Land, TX 77479

Greatwood East 8915 Park River Dr., Sugar Land, TX 77479

Greatwood West 6631 Greatwood Pkwy, Sugar Land, TX 77479

New Territory Blvd 4421 ½ New Territory Blvd., Sugar Land, TX 77479

Homeward Way 5505 Homeward Way, Sugar Land, TX 77479

Thompson Chapel 4603 Thompson Chapel, Sugar Land, TX 77479

Base Bid Items: Sugar Creek Water Plant.

Alternative Bid Items: First Colony Water Plant. New Diesel Fuel Management System. Rust Prevention, Painting, and Protective Coatings.

Note: Alternate bids may be considered depending on the availability of City funds. The City reserves the right to include any or all alternative bid items in its bid evaluation.

Open bids like this one

This one has closed, but there are 5 open generator installation bids in Texas right now. Save a search for generator installation from the card on the left and the next one lands in your inbox on the day it posts.

Why this bid is on SledAtlas

We read every Texas source we have, and federal work performed in Texas, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.