Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement, Solicitation 307e98f9a2944d449d0e77660515abcd, issued by Federal (Oregon offices).
Key facts
- Issuing agency
- Federal (Oregon offices)
- Solicitation number
- 307e98f9a2944d449d0e77660515abcd
- Type
- Solicitation
- Posted
- Aug 28, 2026
- Response deadline
- Sep 18, 2026, 6:00 PM EDT
- Place of performance
- Cascade Locks, OR, 97014
- Set-aside
- Small Business Set Aside - Total
Official description
*** 27 August 2026 - Amendment W9127N26BA0240001 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment inserts additional Government Furnished Information (GFI) as an attachment to the solicitation. The file Power Line Layout is provided for the Contractors information. The Government shall not be responsible for any interpretation of, or conclusion drawn, from the data or information by the Contractor. Information provided should be field verified by the Contractor. If there is a discrepancy between the solicitation plan set and the GFI, the solicitation plan set takes precedence. The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 344½ out-to-out, with two 110 travel lanes, two 20 shoulders, a 50 sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.
Solicitation #W9127N26BA024. Issued by DEPT OF DEFENSE › DEPT OF THE ARMY › W071 ENDIST PORTLAND. NAICS 237310. Product/Service Code Y1LB.
Respond to this bid
This solicitation is administered by the issuing agency through SAM.gov, the federal contracting system. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.
The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.