Michigan209 open bidspricing on 24 of themUpdated daily, many sources several times a dayMichigan’s page

Saved searches

Recently viewed

…

OpenSet-aside: SDVOSB

655-23-101 Site Water Loop Replacement

655-23-101 Site Water Loop Replacement, Solicitation 36C25027B0006, issued by Federal (Ohio offices).

The job

Office
250-Network Contract Office 10 (36c250) (36C250)
Solicitation number
36C25027B0006
Type
Presolicitation
Posted
Nov 4, 2026
Place of performance
Saginaw, MI, 48602
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
236220
Product/service code
Z1DA

Official posting

Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).

Official description

The project’s general scope of work is to furnish all tools, equipment, material, permits, labor, supervision, and all other necessary resources to accomplish the following work: This project replaces a portion of the existing campus water loop piping and existing campus water loop isolation valves. The project also includes installing a water booster pump that will be powered by a new equipment branch of emergency power in Building 22. For the new equipment branch of emergency power to be added, new wiring will feed from Building 19 (generator building) utilizing an existing underground conduit to Building 22 to feed a new emergency power distribution panel which will replace the existing emergency power distribution panel that does not meet code requirements. Installation of a new automatic transfer switch and panelboard along with wiring and conduits will be required to create the new equipment branch of emergency power. The project will also disturb many portions of the existing asphalt roadways and parking lots as well as concrete sidewalks and curbing due to excavation work. The contractor shall patch or replace asphalt and concrete as shown on the drawings and repair any areas of the landscaping and lawn that get disturbed during the project. The existing campus water loop piping is located below many of the existing campus roadways and sidewalks, and it is anticipated that most of the new piping will be as well. Therefore, this project shall be completed in phases to allow campus access for employees and Veterans and maintain water service until a tie-in to an existing building service pipe is to take place. If a shutdown of water service for any building is required during the duration of the project, it must be coordinated with the COR. Period of performance is 300 calendar days from receipt of the Notice to Proceed.

Solicitation #36C25027B0006. Issued by VETERANS AFFAIRS, DEPARTMENT OF › VETERANS AFFAIRS, DEPARTMENT OF › 250-NETWORK CONTRACT OFFICE 10 (36C250). NAICS 236220. Product/Service Code Z1DA.