Chiller replacement general contracting, Ontario County Jail

Re-Bid of Item 1, General Contracting, for the Replacement of the Chiller at Ontario County Jail, Solicitation B25071, issued by Ontario County.

What this job went for

Intelligence

Awarded to Landry Mechanical Contractors, Inc. on Aug 26, 2025.

Bid results · 2 bidders

Every bidder and price, the low bid and the spread:

1 past contract

Who holds it, what it pays and when it ends:

The job

Ontario County is seeking a general contractor to replace the chiller system at the Ontario County Jail. The work involves installing an air-cooled chiller on the roof while maintaining the existing 270T cooling tower and modular chiller system operational during installation, with system cutover scheduled for shoulder months. The project includes demolition and removal of the old cooling tower and chiller.

Trade
HVAC
Also includes
Roofing; Demolition; Carpentry, drywall, ceilings, casework; Concrete, sidewalk, curb; Painting and coatings
Kind of work
Chiller replacement with roof installation
The work
Replacement
Contract
One job
Who can bid
Any qualified firm.
Issuing agency
Ontario County
Solicitation number
B25071
Portal id
175711
Type
purchase
Posted
Jun 18, 2025
Response deadline
Jul 10, 2025, 3:00 PM EDT
Questions due
Jul 1, 2025, 3:00 PM EDT
Place of performance
Ontario County, NY

Official posting

Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).

Official description

Solicitation #B25071. Issued by Department of Public Works. Ontario County is re-bidding Item 1 (from B25049), the General Contracting portion, of the replacement of its chiller at the Ontario County Jail. This project will need to keep the existing CHW system operational, while the replacement is being installed. Once the new system is installed, the old cooling tower and chiller can be demolished and removed. The existing CHW system consists of a 270T cooling tower and Multi-Stack modular chiller, that are both located in the mechanical room. The replacement system is an air cooled chiller being installed on dunnage on the roof, with heat exchangers located in the mechanical room. The cut over of these systems will need to take place during shoulder months.

Open hvac bids in New York

Other trades in New York: RoofingDemolitionCarpentryPick another trade

On the free plan a trade inside a state is your one specific search of the day; a plan searches every trade, every place.