Saved searches

Recently viewed

…

OpenResponses due Nov 10, 2026, 2:00 PM EST

Gravity sewer creek crossing upgrades installation

Gravity Sewer Creek Crossing Upgrades, Solicitation 460-276-53, issued by Orange Water & Sewer Authority.

At a glance

Orange Water & Sewer Authority is seeking a contractor to install approximately 223 linear feet of 8-inch ductile iron water line, 211 linear feet of 12-inch PVC gravity sewer, and 87 linear feet of 18-inch stainless steel gravity sewer, including valve assemblies, connections, testing, stream crossing stabilization, and erosion control. A mandatory site visit or conference is required.

Key facts

Solicitation number
460-276-53
Portal id
fac99d0e-f2b5-f111-aaab-001dd806795b
Type
IFB
Posted
Sep 21, 2026
Response deadline
Nov 10, 2026, 2:00 PM EST
Pre-bid meeting (mandatory)
Oct 7, 2026, 12:00 AM EDT
Place of performance
ORANGE WATER & SEWER AUTHORITY
Official posting
Documents, addenda and the procurement contact, free with an account.
  • sewer installation
  • water mains
  • gravity systems
  • creek crossing
  • erosion control
  • construction

Respond to this bid

This solicitation is administered by the issuing agency through its own procurement system. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The official posting, its documents, addenda and the procurement contact are one click away. Free account, no card, no trial, no spam. Open the official posting

Official description

The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete and operable installation of: Approximately 223 linear feet of 8-inch ductile iron water, 211 linear feet of 12-inch PVC gravity sewer, and 87 linear feet of 18-inch stainless steel gravity sewer including valve assemblies, connections to existing mains, pressure and disinfection testing, fittings, stream and crossing stabilizations, erosion control, sanitary sewer manholes and all associated appurtenances as described in the Specifications and as shown on the Drawings. The foregoing description shall not be construed as a complete description of all work required. Department: ORANGE WATER & SEWER AUTHORITY. Solicitation type: IFB. Commodity (NIGP): 000002 Construction Services. Mandatory conference or site visit. Attachments: 276-53 Gravity Sewer Creek Crossing Upgrades.pdf. Status on the portal: Open. Solicitation #460-276-53.

Don’t miss the next one

Save this bid and SledAtlas keeps its deadline for you. Save a search for sewer installation from the card on the left and the next one lands in your inbox on the day it posts.

What happens when you save this bid

  • It goes on your calendar. The response deadline, the pre-bid meeting land on your SledAtlas calendar and in your own calendar app through your private feed.
  • You get reminded. One email on each of the days you choose before the deadline (your account default applies until you change it for this bid), and a line on your calendar card until you dismiss it.
  • You hear about changes. If the deadline moves, a pre-bid meeting is added or the status changes, it is in your next daily email.
  • Your notes and documents live on the job. Private to you, on the bid’s own page under My bids.

Create a free account and come straight back to this bid. No card, no password; a sign-in code by email or one click with Google.

Why this bid is on SledAtlas

We read every North Carolina source we have, and federal work performed in North Carolina, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.