Where
More filters
State agencies only
Set-aside / certification
OpenResponses due Nov 3, 2026, 11:00 AM EST

Storm drainage improvement project series Q

Collective Storm Drainage Improvement Project - Series Q, Solicitation FY27-ITBCon-27, issued by City of Charlotte.

At a glance

Charlotte Water is seeking contractors for two storm drainage projects: installing 308 linear feet of 48-inch reinforced concrete pipe and CIPP lining 139 linear feet of 15-inch pipe at 805 Lynn St., and realigning a 24-inch system with CIPP lining at 3653 Trailer Dr. The estimated project cost is $1,397,338 with a November 3, 2026 deadline.

Key facts

Issuing agency
City of Charlotte
Solicitation number
FY27-ITBCon-27
Portal id
256797
Posted
Oct 1, 2026
Response deadline
Nov 3, 2026, 11:00 AM EST
Place of performance
Mecklenburg County, NC
Official posting
Documents, addenda and the procurement contact, free with an account.
  • storm drainage
  • pipe installation
  • cipp lining
  • civil construction
  • water utility

Respond to this bid

This solicitation is administered by the issuing agency through its Bonfire procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.

Official description

Reference #FY27-ITBCon-27. Department: Charlotte Water. Description: The Project consists of two separate projects, 805 Lynn St. and 3653 Trailer Dr. The proposed plans for the 805 Lynn St. project calls for installation of 308LF of 48" RCP along a new alignment that shifts the system away from the apartment complex. There is also a 139LF section of 15" RCP to be CIPP lined. 3653 Trailer Dr. aims to realign the existing 24" system to a new outfall point into the stream. The design also requires lining 100LF of 24" CMP with CIPP at the upstream end of the system. The estimated cost for this project is $1,397,338. Project closes Nov 03, 2026 11:00 AM EST.

Don’t miss the next one

Save this bid and SledAtlas keeps its deadline for you. Save a search for storm drainage from the card on the left and the next one lands in your inbox on the day it posts.

What happens when you save this bid

  • It goes on your calendar. The response deadline land on your SledAtlas calendar and in your own calendar app through your private feed.
  • You get reminded. One email on each of the days you choose before the deadline (your account default applies until you change it for this bid), and a line on your calendar card until you dismiss it.
  • You hear about changes. If the deadline moves, a pre-bid meeting is added or the status changes, it is in your next daily email.
  • Your notes and documents live on the job. Private to you, on the bid’s own page under My bids.

Create a free account and come straight back to this bid. No card, no password; a sign-in code by email or one click with Google.

Why this bid is on SledAtlas

We read every North Carolina source we have, and federal work performed in North Carolina, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.