Indian Head Manor pump station demolition and reconstruction
Indian Head Manor Pump Station Improvements, Solicitation 25-010, issued by Charles County.
What this job went for
IntelligenceAwarded to EMH ENVIRONMENTAL INC on Mar 11, 2025.
Bid results · 2 bidders
Every bidder and price, the low bid and the spread:
1 past contract
Who holds it, what it pays and when it ends:
The job
Charles County is seeking qualified contractors to demolish an existing below-grade pump station and construct a new submersible pump station with a 6-foot diameter wet well, above-grade valve enclosure, electrical canopy, and associated piping. The work includes temporary bypass pumping and connections to existing utilities.
- Trade
- Water and sewer
- Also includes
- Electrical and lighting; HVAC
- Kind of work
- Pump station demolition and replacement with new submersible pump station, wet well, valve enclosure and canopy
- The work
- Replacement
- Contract
- One job
- Who can bid
- Any qualified firm.
- Issuing agency
- Charles County
- Solicitation number
- 25-010
- Portal id
- 109237
- Type
- purchase
- Posted
- Aug 21, 2024
- Response deadline
- Dec 11, 2024, 11:00 AM EST
- Pre-bid meeting
- Sep 4, 2024, 10:00 AM EDT
- Place of performance
- Charles County, MD
Official posting
Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).
Official description
Solicitation #25-010. Issued by DPW Utilities - Technical Support. The County Commissioners of Charles County are seeking bids from qualified contractors to demolish the existing below grade pump station. The work also includes the construction of a new submersible style pump station, install a 6-foot diameter wet well, above grade valve enclosure and electrical and instrumentation canopy which includes the following: a. Existing wet well and below grade pump station to be removed. Both below grade structures are approximately 15 feet deep. b. Excavation for the construction of the new submersible pump station. c. Temporary bypass pumping. d. Construct a new 6-foot diameter wet well that is approximately 15 feet below grade, which includes the pumps, discharge piping and level controls. e. Construct a new above grade valve enclosure that includes piping, valves, bypass connection, flow meter, HVAC equipment and instrumentation. f. Construct an electrical and instrumentation canopy. g. Install new yard piping, influent manhole with slide gate and connect into existing utilities.
Open water and sewer bids in Maryland
- OpenDue Nov 4, 2026
- OpenDue Nov 13, 2026
- OpenDue Nov 20, 2026
- OpenDue Dec 9, 2026
- OpenDue Dec 15, 2026
Other trades in Maryland: ElectricalHVACStormwaterPick another trade
On the free plan a trade inside a state is your one specific search of the day; a plan searches every trade, every place.