OpenResponses due Dec 17, 2026, 1:00 PM EST

Sleepy Hollow Road Bridge Replacement Project

Sleepy Hollow Road Bridge Replacement Project, Solicitation FY27-RICHMOND, issued by Berkshire Regional Planning Commission.

The job

Town of Richmond, Massachusetts seeks a contractor to replace a bridge culvert crossing Cone Brook with a precast concrete frame structure while protecting the Cold-Water Fishery stream habitat. Work must comply with Fish & Wildlife, Army Corps of Engineers permits, and a turtle protection plan; the gravel road will remain unpaved. Project deadline is December 17, 2026.

Solicitation number
FY27-RICHMOND
Portal id
322385
Type
purchase
Posted
Nov 12, 2026
Response deadline
Dec 17, 2026, 1:00 PM EST
Pre-bid meeting
Dec 3, 2026, 11:00 AM EST
Questions due
Dec 10, 2026, 4:00 PM EST
Answers posted
Dec 15, 2026, 4:00 PM EST
Award expected
Jan 8, 2027, 12:00 AM EST
Place of performance
Berkshire County, MA

Official posting

Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).

Official description

Solicitation #FY27-RICHMOND. Issued by Group Purchasing. The Sleepy Hollow Road Bridge Replacement Project is located on a rural road in the Town of Richmond located approximately.4 miles east from the intersection of ST 41 and Sleepy Hollow Road. See Location Map below. The bridge crosses Cone Brook, a designated Cold-Water Fishery to the south of the crossing; therefore, construction must protect the stream and restore it to its natural state. Work shall be done, according to the Order of Conditions, Ma Division of Fish & Wildlife NHESP and the Army Corp of Engineers General Permit. The project will require wildlife specialist as part of the turtle protection plan and requirements with the Richmond’s Conservation Order of Conditions. The existing culvert is considered too small to convey high stream flows which has caused significant road overtopping and erosion. The proposed replacement project will replace the culvert with a precast concrete frame structure with precast concrete wingwalls and restore the stream channel to its natural state. The Town will keep the gravel road and not pave it.

Open bids like this one

Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.