Illinois404 open bidspricing on 44 of themUpdated daily, many sources several times a dayIllinois’s page

Saved searches

Recently viewed

…

OpenResponses due Dec 18, 2026, 5:00 PM EST

Kautz Road Substation construction and renovation

KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS, Solicitation RFP-383167-CD, issued by Federal (Illinois offices).

The job

Department
Dept of Energy
Office
Fermilab - DOE Contractor (899034)
Solicitation number
RFP-383167-CD
Type
Solicitation
Posted
Nov 5, 2026
Response deadline
Dec 18, 2026, 5:00 PM EST
Place of performance
Batavia, IL, 60510
NAICS
237130
Product/service code
Z2MZ

Official posting

Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).

Official description

November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project.

Solicitation #RFP-383167-CD. Issued by ENERGY, DEPARTMENT OF › ENERGY, DEPARTMENT OF › FERMILAB - DOE CONTRACTOR. NAICS 237130. Product/Service Code Z2MZ.

Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.