Demolition and hazardous abatement for Fulton County Jail
26ITB0921226K-CRB Abatement & Demolition Services for Fulton County Jail Project, Solicitation PE-66096-NONST-2026-000000223, issued by State of Georgia.
The job
Fulton County is seeking a contractor for complete demolition of existing structures and hazardous material abatement at a 32.86-acre jail project site. Work includes asbestos removal, lead abatement, debris disposal, erosion control, and site clearing. Mandatory site visit on November 10, 2026; bids due November 20, 2026.
- Issuing agency
- State of Georgia
- Solicitation number
- PE-66096-NONST-2026-000000223
- Portal id
- gpr20:PE-66096-NONST-2026-000000223
- Type
- Non-State Agency
- Posted
- Oct 28, 2026
- Response deadline
- Nov 20, 2026, 11:00 AM EST
- Place of performance
- Fulton County Purchasing Dept
Official posting
Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).
Official description
Non-State Agency. Issued by Fulton County Purchasing Dept (GPR buyer 66096). Purchase type: Non-State Agency. Category: Services / Special Projects. Government type: county. Fiscal year 2026. Fulton County, Georgia "County" The scope of work includes demolition and removal of existing buildings, utilities, pavement, and other noted structures; identification, handling, abatement, removal, transportation, and lawful disposal of hazardous materials associated with the demolition activities, including, but not limited to, asbestos-containing materials (ACM), lead-containing materials, hazardous coatings, and other regulated substances identified in the project documents or encountered during demolition; installation and maintenance of erosion and sedimentation control measures; clearing and grubbing of vegetation within designated disturbance limits; demolition debris removal and disposal; temporary stabilization; and all incidental work necessary to create the proposed green space for a future facility. The project site consists of approximately 32.86 acres, with an estimated 3.30 acres of disturbed area. Bidders shall provide pricing for both Phase 1 and Phase 2 as shown in the drawings as a single demolition package. All provisions of the project plans and specifications shall apply and shall be recognized by all bidders. PROJECT SITE VISIT The County will conduct a mandatory guided tour of the facility site immediately following the Pre-Bid Conference on Tuesday, November 10, 2026. Attendance at the project site visit is mandatory. The County will provide transportation for all participants. Only two (2) representatives from each firm will be allowed to participate as space is limited. Please note that bidders who do not participate in the mandatory project site visit will be precluded from contract award. Prior to the Pre-Bid Conference, interested Bidders must contact the purchasing representative, Craig Bogan, via email at (on the official posting) and provide the names of the two (2) representatives to be added to the list to attend. The shuttle will depart immediately following the Pre-Bid Conference from the Lower Parking Lot at the Emma NIGP: 91240 Demolition Services; 91238 Construction Services, Hazardous Waste, Including Site Management; 91219 Clearing and Grubbing Services; 90930 Building Construction, (Not Otherwise Classified); 90625 Design Build, Architectural Services (Inactive, effective January 1, 2016); 76055 Mats, Erosion Control Blankets, Rolled; 34505 Asbestos Abatement Equipment and Supplies. Documents: 26ITB0921226K_CRB.pdf. Agency posting: https://www.bidnetdirect.com/georgia/fultoncounty Status on the registry: Open. Event PE-66096-NONST-2026-000000223.
Open bids like this one
- OpenDue Nov 16, 2026
- OpenDue Nov 17, 2026
- OpenDue Nov 17, 2026
- OpenDue Nov 17, 2026
- OpenDue Nov 17, 2026
Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.