Saved searches

Recently viewed

…

OpenResponses due Oct 30, 2026, 8:00 AM EDT

Peachtree raw water pump station design-build services

Pre-Advertisement Notice for DWM Peachtree Raw Water Pump Station Project, Solicitation PE-66062-NONST-2027-000000495, issued by State of Georgia.

At a glance

Atlanta's Department of Watershed Management seeks a qualified progressive design-builder to rehabilitate and replace pumps at the Peachtree Raw Water Pump Station, including building improvements, electrical upgrades, and raw water main development. Firms must demonstrate experience with similar water infrastructure projects and ability to coordinate design-build delivery with guaranteed maximum pricing. Prequalification phase begins with a pre-solicitation conference to be noticed.

Key facts

Issuing agency
State of Georgia
Solicitation number
PE-66062-NONST-2027-000000495
Portal id
gpr20:PE-66062-NONST-2027-000000495
Type
Non-State Agency
Posted
Oct 6, 2026
Response deadline
Oct 30, 2026, 8:00 AM EDT
Place of performance
Atlanta, City Of
Official posting
Documents, addenda and the procurement contact, free with an account.
  • water infrastructure
  • design-build
  • pump station
  • engineering
  • construction
  • progressive delivery

Respond to this bid

This solicitation is administered by the issuing agency through its own procurement system. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The official posting, its documents, addenda and the procurement contact are one click away. Free account, no card, no trial, no spam. Open the official posting

Official description

Non-State Agency. Issued by Atlanta, City Of (GPR buyer 66062). Purchase type: Non-State Agency. Category: Services / Special Projects. Government type: city. Fiscal year 2027. The City of Atlanta, on behalf of the Department of Watershed Management (DWM), will shortly undergo a MultiStep Sealed Bid process comprised of a prequalification phase as the initial step, followed by an Invitation for Bid (IFB), towards the procurement of a qualified Progressive Design-Builder to provide design, preconstruction, and construction services for the Peachtree Raw Water Pump Station (PRWPS) improvements. The scope includes, but is not limited to, rehabilitation and replacement of existing pumps, improvements to Pump Buildings 1 and 2, electrical distribution system improvements, evaluation of raw water main alternatives, and development of a dedicated raw water main serving Pumps 1 and 2. Interested firms during the prequalification phase must demonstrate experience and capacity successfully delivering Progressive Design-Build or comparable water infrastructure projects, including the professional design and engineering expertise, construction capabilities, staffing, project management, and resources necessary to perform work of similar size, scope, and complexity. Firms must demonstrate the ability to coordinate design and construction activities, advance the project design, perform constructability and cost evaluations, and support development of a Guaranteed Maximum Price (GMP) prior to construction. A Pre-Solicitation Conference will be noticed and held to provide more details and address questions. We hope to see you there. NIGP: 92597 Water Supply, Treatment, and Distribution Engineering; 92531 Electrical Engineering, Including Cogeneration Design Services; 92567 Mechanical Engineering; 92596 Waste Water Treatment Engineering; 90740 Engineering Services, Non-Licensed (Not Otherwise Classified), Including Consulting; 91107 C.I.P., Architectural and Engineering Services; 91360 Construction, Water System, Plants, Main and Service Line. Documents: Exhibit B1 _ Design Criteria_Rev3_Water Draft.pdf; Exhibit A _ Project Criteria_Rev2_Water Draft.pdf. Agency posting: http://ATLsuppliers.com Status on the registry: Open. Event PE-66062-NONST-2027-000000495.

Don’t miss the next one

Save this bid and SledAtlas keeps its deadline for you. Save a search for water infrastructure in Georgia from the card on the left and the next one lands in your inbox on the day it posts.

What happens when you save this bid

  • It goes on your calendar. The response deadline land on your SledAtlas calendar and in your own calendar app through your private feed.
  • You get reminded. One email on each of the days you choose before the deadline (your account default applies until you change it for this bid), and a line on your calendar card until you dismiss it.
  • You hear about changes. If the deadline moves, a pre-bid meeting is added or the status changes, it is in your next daily email.
  • Your notes and documents live on the job. Private to you, on the bid’s own page under My bids.

Create a free account and come straight back to this bid. No card, no password; a sign-in code by email or one click with Google.

Why this bid is on SledAtlas

We read every Georgia source we have, and federal work performed in Georgia, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.