Camp Creek Outfall Replacement Phase 1 Sewer Installation
2026-PME-12 Camp Creek Outfall Replacement - Phase 1, Solicitation PE-63125-NONST-2027-000000081, issued by State of Georgia.
At a glance
Clayton County Water Authority is seeking a licensed utility contractor to install approximately 14,453 linear feet of new 36-inch and 30-inch gravity-flow sanitary sewer to replace existing infrastructure and reconnect smaller sewers in the Camp Creek Outfall project. Work is located in Clayton County, Georgia, with a bid due date of October 8, 2026.
Key facts
- Issuing agency
- State of Georgia
- Solicitation number
- PE-63125-NONST-2027-000000081
- Portal id
- gpr20:PE-63125-NONST-2027-000000081
- Type
- Non-State Agency
- Posted
- Sep 8, 2026
- Response deadline
- Oct 8, 2026, 3:00 PM EDT
- Place of performance
- Clayton County Water Authority
- Official posting
- Documents, addenda and the procurement contact, free with an account.
Respond to this bid
This solicitation is administered by the issuing agency through its own procurement system. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.
The official posting, its documents, addenda and the procurement contact are one click away. Free account, no card, no trial, no spam. Open the official posting
Official description
Non-State Agency. Issued by Clayton County Water Authority (GPR buyer 63125). Purchase type: Non-State Agency. Category: Construction / Public Works. Government type: county. Fiscal year 2027. The Clayton County Water Authority (CCWA) intends to contract with an experienced licensed utility contractor to complete the Camp Creek Outfall Replacement � Phase 1 Project. The purpose of the Project is to install approximately 14,453 linear feet of new 36-inch and 30-inch gravity-flow sanitary sewer replacing an existing 30-inch gravity-flow sanitary sewer. Multiple reconnections of smaller existing sewers will be required to complete the work. NIGP: 91392 Maintenance and Repair, Water System, Main and Service Line; 91381 Maintenance and Repair, Sewer and Storm Drain, Including Removal; 91345 Construction, Sewer and Storm Drain; 91356 Construction, Utility and Underground Projects; 91340 Construction, Pipeline, Including Aerial Crossings. Documents: 2026_PME_12 Addendum 1.pdf; 2026_PME_12 Addendum 2.pdf; 2026_PME_12 Addendum 3.pdf; 2026_PME_12 Camp Creek Outfall Replacement _.pdf. Agency posting: http://ccwa.bonfirehub.com Status on the registry: Open. Event PE-63125-NONST-2027-000000081.
Don’t miss the next one
Save this bid and SledAtlas keeps its deadline for you. Save a search for sewer installation in Georgia from the card on the left and the next one lands in your inbox on the day it posts.
- OpenDue Oct 13, 2026
- OpenDue Oct 22, 2026
- OpenDue Oct 29, 2026
What happens when you save this bid
- It goes on your calendar. The response deadline land on your SledAtlas calendar and in your own calendar app through your private feed.
- You get reminded. One email on each of the days you choose before the deadline (your account default applies until you change it for this bid), and a line on your calendar card until you dismiss it.
- You hear about changes. If the deadline moves, a pre-bid meeting is added or the status changes, it is in your next daily email.
- Your notes and documents live on the job. Private to you, on the bid’s own page under My bids.
Create a free account and come straight back to this bid. No card, no password; a sign-in code by email or one click with Google.
Why this bid is on SledAtlas
We read every Georgia source we have, and federal work performed in Georgia, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.