Saved searches

Recently viewed

…

OpenResponses due Nov 10, 2026, 9:00 AM EST

Electric primary feeder system construction labor

BLUE BIRD EXPANSION, Solicitation PE-33552-NONST-2027-000000021, issued by State of Georgia.

At a glance

Fort Valley Utility Commission seeks experienced electrical contractors for labor-only work installing a 7.2/12.47 kV three-phase underground electric distribution system for the Blue Bird Expansion Project in Fort Valley, Georgia. The utility will provide major materials; the contractor supplies all labor, supervision, equipment, and testing. Mandatory pre-bid meeting November 2, 2026 at 10:00 AM; bids due November 10, 2026.

Key facts

Issuing agency
State of Georgia
Solicitation number
PE-33552-NONST-2027-000000021
Portal id
gpr20:PE-33552-NONST-2027-000000021
Type
Non-State Agency
Posted
Sep 28, 2026
Response deadline
Nov 10, 2026, 9:00 AM EST
Place of performance
Fort Valley Utility Commission
Official posting
Documents, addenda and the procurement contact, free with an account.
  • electrical construction
  • utility distribution
  • underground cable
  • labor-only
  • high voltage
  • infrastructure

Respond to this bid

This solicitation is administered by the issuing agency through its own procurement system. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The official posting, its documents, addenda and the procurement contact are one click away. Free account, no card, no trial, no spam. Open the official posting

Official description

Non-State Agency. Issued by Fort Valley Utility Commission (GPR buyer 33552). Purchase type: Non-State Agency. Category: Goods. Government type: city. Fiscal year 2027. The Fort Valley Utility Commission (FVUC) will accept sealed bids from qualified contractors for labor associated with theconstruction of the electric primary feeder system serving the Blue Bird Expansion Project in Fort Valley, Georgia.The project generally consists of construction and installation of a 7.2 kV phase-to-ground / 12.47 kV phase-to-phase,three-phase underground electric distribution system, including undergroundprimary cable and conduit systems,pad-mounted transformers, PME switchgear, primary metering equipment, terminating cabinets, vaults, pads, grounding,terminations, testing, commissioning, and associated work as described in the Statement of Work and construction drawings.This project shall be bid on a labor-only basis. Fort Valley Utility Commission will furnish the major electrical materialsrequired for construction as identified in the Contract Documents. The Contractor shall furnish all labor, supervision, qualifiedpersonnel, construction equipment, tools, transportation, testing equipment, safety equipment, and other labor-related itemsnecessary to provide a complete installation of FVUC-furnished materials.The project completion date shall be TBD by Parrish Construction and Blue Bird.Bids will be considered only from experiencedand properly licensed contractors regularly engaged in electric utilityconstruction of similar type and magnitude. All work shall comply with the applicable ECG Construction AssemblySpecifications for 12.5/7.2 kV Distribution Systems, FVUC standards and specifications, approved project drawings,manufacturer requirements, NESC, OSHA, Georgia 811, and applicable federal, state, and local requirementsTheStatement of Work and applicable construction drawings are included with or incorporated into the bid package MANDATORY PRE BID NOVEMBER 02 2026 AT 10:00AM 500 AnthoineStreet, FortValley, Georgia 31030. Contact Ray Martin at (on the official posting) or (on the official posting). NIGP: 91775 Maintenance and Repair, Other Infrastructure; 91356 Construction, Utility and Underground Projects; 93677 Substation High Voltage, Electrical Maintenance and Repair. Documents: Fort Valley _ Blue Bird Expansion.pdf; Blue Bird Expansion Bid Package (3).pdf. Status on the registry: Open. Event PE-33552-NONST-2027-000000021.

What happens when you save this bid

  • It goes on your calendar. The response deadline land on your SledAtlas calendar and in your own calendar app through your private feed.
  • You get reminded. One email on each of the days you choose before the deadline (your account default applies until you change it for this bid), and a line on your calendar card until you dismiss it.
  • You hear about changes. If the deadline moves, a pre-bid meeting is added or the status changes, it is in your next daily email.
  • Your notes and documents live on the job. Private to you, on the bid’s own page under My bids.

Create a free account and come straight back to this bid. No card, no password; a sign-in code by email or one click with Google.

Why this bid is on SledAtlas

We read every Georgia source we have, and federal work performed in Georgia, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.