Florida662 open bidspricing on 81 of themUpdated daily, many sources several times a dayFlorida’s page

Saved searches

Recently viewed

…

OpenResponses due Jan 8, 2027, 2:00 PM EST

City of Stuart Floridian Aquifer Production Well FA-2

City of Stuart Floridian Aquifer Production Well FA-2, Solicitation 2027-106, issued by City of Stuart.

The job

Issuing agency
City of Stuart
Solicitation number
2027-106
Portal id
318421
Type
purchase
Posted
Oct 30, 2026
Response deadline
Jan 8, 2027, 2:00 PM EST
Pre-bid meeting
Nov 6, 2026, 2:00 PM EST
Questions due
Dec 21, 2026, 8:00 AM EST
Place of performance
Martin County, FL

Official posting

Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).

Official description

Solicitation #2027-106. Issued by Utilities and Engineering. The purpose of this bid is to solicit qualified licensed general contractors to submit bids for construction of one (1) Floridan Aquifer production well (FA-2) for the City of Stuart’s Water Treatment Facility located at 1002 SE Palm Beach Road, Stuart, FL 34994. The qualified Bidder shall hold a current and active Florida Water Well Contractor license and a Florida Certified General Contractor (CGC) license. The proposed location of the Floridan well is approximately 1,500 LF west of the water treatment facility. Scope of work includes, but is not limited to drilling, setting of steel and PVC casings, grouting, flow testing, wellhead assembly, acidizing (if necessary), well logging, pump testing, formation water disposal system (including temporary piping, pumps, and settling tanks), well facility disinfection and restoration of well site. Work shall include furnishing all labor, materials, and equipment to complete the work as specified and in accordance with the drawings, specifications, and other contract documents. NOTE: Additive Alternate Bid Items The following work shall be included under additive alternate bid items which the Owner may elect to construct under this contract in the priorities listed. The work under this additive alternate is depicted on the drawings and specified herein: Additive Alternate 1: Work shall include all mechanical, electrical, structural, civil, instrumentation, etc. to provide a complete and operational wellhead and connection to raw watermain for FA-2 (completed by others).

Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.