Where
More filters
State agencies only
Set-aside / certification
OpenResponses due Oct 9, 2026, 3:30 PM EDT

Tradition Parkway and Village Parkway intersection improvements

Construction of Tradition Pkwy and Village Pkwy Intersection Improvements, Solicitation 286479, issued by City of Port St. Lucie.

At a glance

The City of Port St. Lucie is seeking a qualified contractor to construct roadway and intersection improvements at Tradition Parkway and Village Parkway, including pavement resurfacing, sidewalk reconstruction, pedestrian safety features, drainage modifications, traffic control, and signal infrastructure. Bids are due October 9, 2026, and the contractor must provide all labor, materials, equipment, and coordination with city staff and utilities.

Key facts

Solicitation number
286479
Type
purchase
Posted
Sep 9, 2026
Response deadline
Oct 9, 2026, 3:30 PM EDT
Pre-bid meeting
Sep 14, 2026, 11:00 AM EDT
Questions due
Sep 24, 2026, 4:00 PM EDT
Answers posted
Oct 1, 2026, 4:00 PM EDT
Place of performance
St. Lucie County, FL
Official posting
Documents, addenda and the procurement contact, free with an account.
  • road construction
  • intersection improvements
  • pedestrian safety
  • pavement
  • drainage
  • traffic control
  • civil construction

Respond to this bid

This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.

Official description

Solicitation #20260293. Issued by Public Works. Pursuant to the Port St. Lucie City Code of Ordinance 35.07, this electronic Invitation for Bids (IFB) is being issued to establish a contract with a qualified proposer who will provide Construction of Tradition Pkwy and Village Pkwy Intersection Improvements to the City of Port St. Lucie (hereinafter, “City”) as further described in this IFB. The City of Port St. Lucie (City) requires Construction Services for the construction of roadway improvements at the intersection of Tradition Parkway and Village Parkway within the City of Port St. Lucie. The roadway improvements are described in the project plan set prepared by DRMP entitled “City of Port St. Lucie Contract Plans Tradition & Village Pkwy”. The project includes roadway, intersection, and multimodal enhancements necessary to support the final lane configurations, operational improvements, and safety features shown in the approved design plans. Work generally consists of pavement resurfacing and widening, installation of curb and gutter, concrete separators, sidewalk and pedestrian facility reconstruction, transit‑related improvements, driveway adjustments, drainage modifications, grading, and other associated civil construction tasks required to implement the planned intersection geometry. The project also incorporates features to improve pedestrian and bicyclist safety, including reconstructed crosswalks, curb ramps, and other elements consistent with protected‑intersection concepts presented in the design including public feedback. Additional work includes temporary traffic control, stormwater management measures, permitting activities, signing and pavement marking improvements, and roadway lighting adjustments to accommodate the new configuration and resolve conflicts with existing equipment. Signal‑related work will include installation of conduit, pull boxes, and other infrastructure required to support the traffic signal improvements, along with coordination with the City’s signal contractor regarding locations, phasing, and scheduling of signalization components. The Contractor shall become fully familiar with all bid documents and shall complete all work necessary to construct the project as designed. The Contractor is responsible for providing all labor, materials, equipment, tools, transportation, and incidentals required to deliver the project in accordance with the Contract Plans, Specifications, Standards, and Special Provisions. The Contractor shall coordinate with City staff, CEI personnel, utility owners, and adjacent property stakeholders as needed to support smooth execution of the Work. The City’s Project Manager will be informed of any significant omissions, substitutions, defects, and deficiencies noted in the work of the Construction Contractor and all corrective actions taken. In addition, the Consultant shall provide administrative support to the City.

Don’t miss the next one

Save this bid and SledAtlas keeps its deadline for you. Save a search for road construction in Florida from the card on the left and the next one lands in your inbox on the day it posts.

What happens when you save this bid

  • It goes on your calendar. The response deadline, the pre-bid meeting and the questions deadline land on your SledAtlas calendar and in your own calendar app through your private feed.
  • You get reminded. One email on each of the days you choose before the deadline (your account default applies until you change it for this bid), and a line on your calendar card until you dismiss it.
  • You hear about changes. If the deadline moves, a pre-bid meeting is added or the status changes, it is in your next daily email.
  • Your notes and documents live on the job. Private to you, on the bid’s own page under My bids.

Create a free account and come straight back to this bid. No card, no password; a sign-in code by email or one click with Google.

Why this bid is on SledAtlas

We read every Florida source we have, and federal work performed in Florida, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.