McIntosh Power Plant cooling tower distribution system replacement

McIntosh Power Plant Cooling Tower Distribution System Replacement, Solicitation 2026-RFP-120, issued by City of Lakeland.

At a glance

Lakeland Electric is seeking contractors to replace the cooling water distribution system at McIntosh Power Plant, including removal of existing piping and nozzles and installation of a complete new system. Work will be performed during a scheduled spring 2027 outage (April 30–May 17) with coordination required to meet unit startup timelines.

Key facts

Issuing agency
City of Lakeland
Solicitation number
2026-RFP-120
Portal id
304850
Type
purchase
Posted
Sep 18, 2026
Response deadline
Oct 14, 2026, 4:00 PM EDT
Pre-bid meeting
Sep 30, 2026, 9:00 AM EDT
Questions due
Oct 6, 2026, 5:00 PM EDT
Place of performance
Polk County, FL
Official posting
Documents, addenda and the procurement contact, free with an account.
  • power plant
  • cooling systems
  • piping installation
  • industrial maintenance
  • equipment replacement

Respond to this bid

This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.

Official description

Solicitation #2026-RFP-120. Issued by LE - Production - MPP. The City of Lakeland, Lakeland Electric (OWNER), is seeking qualified contractors to provide all labor, supervision, materials, equipment, and services necessary for the replacement of the existing cooling water distribution system at McIntosh Power Plant. The work generally consists of removing the existing header piping, lateral piping, and spray nozzles and furnishing and installing a complete new distribution system. The work will be performed during the Spring 2027 (April 30-May 17) scheduled outage. The Contractor will be required to coordinate closely with Lakeland Electric and complete the work within the established cooling tower availability window to support scheduled unit startup activities.

Don’t miss the next one

Save this bid and SledAtlas keeps its deadline for you. Save a search for power plant in Florida from the card on the left and the next one lands in your inbox on the day it posts.

What happens when you save this bid

  • It goes on your calendar. The response deadline, the pre-bid meeting and the questions deadline land on your SledAtlas calendar and in your own calendar app through your private feed.
  • You get reminded. One email on each of the days you choose before the deadline (your account default applies until you change it for this bid), and a line on your calendar card until you dismiss it.
  • You hear about changes. If the deadline moves, a pre-bid meeting is added or the status changes, it is in your next daily email.
  • Your notes and documents live on the job. Private to you, on the bid’s own page under My bids.

Create a free account and come straight back to this bid. No card, no password; a sign-in code by email or one click with Google.

Why this bid is on SledAtlas

We read every Florida source we have, and federal work performed in Florida, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.