Florida662 open bidspricing on 81 of themUpdated daily, many sources several times a dayFlorida’s page

Saved searches

Recently viewed

…

OpenResponses due Dec 16, 2026, 2:00 PM EST

PHASE 3D PROJECT 6 INFRASTRUCTURE IMPROVEMENTS

PHASE 3D PROJECT 6 INFRASTRUCTURE IMPROVEMENTS, Solicitation ITB-C-2627-003, issued by City of Jacksonville Beach.

The job

Solicitation number
ITB-C-2627-003
Portal id
318371
Type
purchase
Posted
Nov 11, 2026
Response deadline
Dec 16, 2026, 2:00 PM EST
Pre-bid meeting
Nov 18, 2026, 10:00 AM EST
Questions due
Dec 4, 2026, 4:00 PM EST
Place of performance
Duval County, FL

Official posting

Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).

Official description

Solicitation #ITB-C-2627-003. Issued by Public Works. The project runs along 1st St. S. from 16th Ave. S. to 14th Ave. S., 2nd St. S. from 16th Ave. S. to 14th Ave. S., 3rd Street from 16th Ave. S. to 14th Ave. S., as well as along the avenues from 16th Ave. S. to 14th Ave. S. The scope of work includes replacement of existing water mains and gravity sanitary sewer lines, roadway reconstruction, new curb and gutter work, new driveways, parking and sidewalks, drainage improvements, lighting and electrical, and signing and pavement marking. The work includes, but not limited, to the following:

Work will include reconstruction of the roadway, sidewalk, curb and gutters within project limits per typical section. Existing water, sewer and stormwater pipes and lines are to be reconstructed within project limits. Parking areas are to be paved with concrete with fiber mesh as shown in the plans. Driveways are to be reconstructed as shown in the plans. Sewer manholes throughout project limits are to be removed and replaced with a lined manhole or to be lined and rehabilitated as shown in the plans. Construction within project limits to also include, service adjustments, replacement of valve covers and meter boxes, electrical junction box adjustments and electrical pull box covers, installation of curbing, utility protection including gas, phone, cable, underground electric, sewer and water. The contractor is to coordinate with property owners to maintain business and residential pedestrian access as well as emergency vehicle access within project limits.

Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.