Lift Station E-08 Backup Electrical Power Generator (Project No. 25-8071A)
Lift Station E-08 Backup Electrical Power Generator (Project No. 25-8071A), Solicitation IFB-451-27-JM, issued by City of Hollywood.
The job
- Issuing agency
- City of Hollywood
- Solicitation number
- IFB-451-27-JM
- Portal id
- 323033
- Type
- purchase
- Posted
- Nov 3, 2026
- Response deadline
- Dec 9, 2026, 3:00 PM EST
- Pre-bid meeting
- Nov 16, 2026, 2:00 PM EST
- Questions due
- Nov 19, 2026, 5:00 PM EST
- Place of performance
- Broward County, FL
Official posting
Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).
Official description
Solicitation #IFB-451-27-JM. Issued by Public Utilities. The work to be performed includes site, civil, structural and electrical work associated with the construction of LS E-08 Backup Electrical Power Generator Project in the City of Hollywood. The work to be performed includes but is not limited to the removal of existing generator, fuel tank, electrical items, installation of new emergency generator that is designed to be protected against a 500-year flood event, fuel tank, access for maintenance with all ancillary equipment as required, as shown on the plans. The construction activities include but are not limited to survey, locating and protecting existing utilities, maintenance of traffic, soil boring, dewatering, electrical equipment installation, restoration, furnishing and installing emergency generator, temporary MOT, maintaining building access, maintaining continuous sanitary service and property access, coordination with different agencies such as the City, FEMA, AT&T, and FPL, preparation and submittal of shop drawings and record drawings, testing, and other repairs or restorations. Work shall be performed to ensure continuous operation and appropriate performance of all existing water, sewer, stormwater and franchise utilities systems, to minimize impacts to roadway traffic, parking, residents and/or businesses and shall be coordinated with the City in advance. It is the intent of the City to obtain a complete and working installation under this contract and any items of labor, materials or equipment, which may reasonably be assumed as necessary to accomplish this end, should be supplied whether or not specifically shown on the plans or described herein. Maintenance of the existing utility systems is mandated throughout the construction period.
Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.