Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262
Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262, Solicitation IFB-440-26-JM, issued by City of Hollywood.
The job
- Issuing agency
- City of Hollywood
- Solicitation number
- IFB-440-26-JM
- Portal id
- 313241
- Type
- purchase
- Posted
- Oct 26, 2026
- Response deadline
- Dec 14, 2026, 3:00 PM EST
- Pre-bid meeting
- Nov 9, 2026, 9:00 AM EST
- Questions due
- Nov 16, 2026, 5:00 PM EST
- Place of performance
- Broward County, FL
Official posting
Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).
Official description
Solicitation #IFB-440-26-JM. Issued by Public Utilities. Demolition and installation of process systems and equipment at the City of Hollywood Water Treatment Facility. Major work elements include removal and replacement of lime slaker systems no. 2 and 3, including associated pumps, tanks, piping, valves, electrical, controls, and structural repairs; demolition and replacement of the filter surface wash system; demolition and replacements of the sodium hexametaphosphate (SHMP) feed system, including new equipment pads, trench grating, electrical, controls, and flow monitoring; and demolition and replacement of sludge pump piping, flushing water line, and reconfiguration of the existing standby sludge pump. All work shall include start-up, testing, and commissioning as required to provide fully operational systems.
Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.