Marshall Street water reclamation facility sand filter rehabilitation

Marshall Street WRF Sand Filter Rehabilitation, Solicitation 25-0008-UT, issued by City of Clearwater.

At a glance

City of Clearwater Public Works is seeking a contractor to rehabilitate 12 sand filters and associated equipment at the Marshall Street Water Reclamation Facility, including replacing pneumatic actuators, check valves, sodium hypochlorite pumps, and upgrading the filtration control system with a new touch screen and SCADA interface. The project must be completed within 420 calendar days from notice to proceed, with bids due October 8, 2026.

Key facts

Issuing agency
City of Clearwater
Solicitation number
25-0008-UT
Portal id
294139
Type
purchase
Posted
Aug 26, 2026
Response deadline
Oct 8, 2026, 2:00 PM EDT
Pre-bid meeting
Sep 9, 2026, 10:00 AM EDT
Questions due
Sep 16, 2026, 5:00 PM EDT
Place of performance
Pinellas County, FL
Official posting
Documents, addenda and the procurement contact, free with an account.
  • water treatment
  • sand filters
  • equipment rehabilitation
  • scada systems
  • municipal utilities

Respond to this bid

This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.

Official description

Solicitation #25-0008-UT. Issued by Public Works. Rehabilitate twelve (12) existing sand filters, associated equipment, remove and replace seven (7) Kinetrol pneumatic actuator yokes on 20-inch Butterfly Valves (Filter Cells 1, 2, 7, 8, 11, and 12), flange bolts on 20-inch Backwash Inlet Butterfly Valve (Filter Cell 7, will only be necessary if Contractor confirms the valve is not functioning), two (2) 18-inch backwash pump discharge Check Valves (will only be necessary if Contractor tests and confirms the backwash flow rate is compromised), sodium hypochlorite pumps and associated piping. Other improvements include replacement of the touch screen for the main filter control panel with improved graphics and functionality, and upgrading the SCADA interface in the filter control room to facilitate total local control of the filtration system at the Marshall Street WRF. Contract Period: 420 Calendar Days from Notice to Proceed

Don’t miss the next one

Save this bid and SledAtlas keeps its deadline for you. Save a search for water treatment in Florida from the card on the left and the next one lands in your inbox on the day it posts.

What happens when you save this bid

  • It goes on your calendar. The response deadline, the pre-bid meeting and the questions deadline land on your SledAtlas calendar and in your own calendar app through your private feed.
  • You get reminded. One email on each of the days you choose before the deadline (your account default applies until you change it for this bid), and a line on your calendar card until you dismiss it.
  • You hear about changes. If the deadline moves, a pre-bid meeting is added or the status changes, it is in your next daily email.
  • Your notes and documents live on the job. Private to you, on the bid’s own page under My bids.

Create a free account and come straight back to this bid. No card, no password; a sign-in code by email or one click with Google.

Why this bid is on SledAtlas

We read every Florida source we have, and federal work performed in Florida, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.