Ground storage tank construction, 750,000-gallon capacity
Mid-Clay Water Reclamation Facility (WRF) Ground Storage Tank (GST) No. 3, Solicitation ITB No. 2025/2026-A12, issued by Clay County Utility Authority.
What this job went for
IntelligenceBid results · 3 bidders
Every bidder and price, the low bid and the spread:
1 past contract
Who holds it, what it pays and when it ends:
The job
Clay County Utility Authority is seeking sealed bids to design and construct a 750,000-gallon prestressed concrete ground-level reclaimed water storage tank (GST No. 3) at the Mid-Clay Water Reclamation Facility in Middleburg, Florida. Work includes site preparation, tank construction, yard piping, testing, startup, and site restoration. Bids due October 9, 2026.
- Trade
- Tanks and towers
- Also includes
- Water and sewer
- Kind of work
- prestressed concrete reclaimed water ground storage tank
- The work
- New construction or installation
- Contract
- One job
- Size
- 750,000 gallons, as the posting states it
- Who can bid
- Any qualified firm.
- Issuing agency
- Clay County Utility Authority
- Solicitation number
- ITB No. 2025/2026-A12
- Portal id
- 302500
- Type
- purchase
- Posted
- Sep 11, 2026
- Response deadline
- Oct 9, 2026, 2:00 PM EDT
- Pre-bid meeting
- Sep 22, 2026, 10:00 AM EDT
- Questions due
- Sep 29, 2026, 12:00 PM EDT
- Answers posted
- Oct 2, 2026, 5:00 PM EDT
- Place of performance
- Clay County, FL
Official posting
Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).
Official description
Solicitation #ITB No. 2025/2026-A12. Issued by Engineering. CCUA requests sealed bids from qualified Bidders for Mid-Clay Water Reclamation Facility (WRF) Ground Storage Tank (GST) No. 3. The Selected CONTRACTOR shall furnish and construct, unless otherwise noted, all necessary permits, labor, equipment, and materials to complete the Mid-Clay WRF GST No. 3 Project. Mid-Clay WRF is located at 2926 Jubilee Lane, approximately 0.2 miles North of Sandridge Boulevard, in Middleburg, FL. The work shall consist of the following, but not limited to, the Work identified in the Solicitation Documents. Mobilization/Demobilization, General Requirements, and Bonds and Insurance. Environmental Protection. Placing compacted fill located on site for preparation for the GST foundation in accordance with the Contract Documents. Construction of a 750,000-gallon capacity prestressed concrete ground-level reclaimed water storage tank and associated yard piping. Site restoration. Conduct all necessary testing and start-up. Prepare Record Drawings.
A detailed summary of Work is provided in the bid documents and drawings. CONTRACTOR is responsible for protecting existing materials, structures, and equipment on-site during construction activities. All materials, methods of construction, and standards must be in accordance with the CCUA’s approved material manual, specs, and details. CCUA will evaluate the bids, and the award will be made to the lowest responsive and responsible bidder selected by CCUA.
Open tanks and towers bids in Florida
- OpenDue Dec 9, 2026
- OpenDue Dec 17, 2026
- OpenDue Dec 17, 2026
- OpenDue Jan 5, 2027
- OpenDue Jan 12, 2027
Other trades in Florida: Water and sewerWelding and metalPaintingPick another trade
On the free plan a trade inside a state is your one specific search of the day; a plan searches every trade, every place.