Blue Spring State Park restroom replacement construction

Addendum 3 BDC02-26/27 Blue Spring - Restroom Replacement, issued by State of Florida.

At a glance

Florida DEP is accepting bids for restroom replacement at Blue Spring State Park. Work includes new fiberglass-reinforced polymer doors in stainless-steel frames, epoxy flooring with cove base, CMU block benches with concrete tops, and toilet compartments. Bid due October 13, 2026.

Key facts

Issuing agency
State of Florida
Solicitation number
BDC02-26/27
Portal id
17202
Type
Invitation to Bid
Posted
Oct 7, 2026
Response deadline
Oct 13, 2026, 3:30 PM EDT
Place of performance
Department of Environmental Protection (DEP)
Official posting
Documents, addenda and the procurement contact, free with an account.
  • restroom construction
  • commercial building
  • flooring
  • doors and frames
  • state park

Respond to this bid

This solicitation is administered by the issuing agency through its own procurement system. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The official posting, its documents, addenda and the procurement contact are one click away. Free account, no card, no trial, no spam. Open the official posting

Official description

October 7, 2026

NOTICE TO APPLICANTS ADDENDUM NO. THREE (3)

Blue Spring State Park - Restroom Replacement DEP BID NO. BDC02-26/27

TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.

NOTICE

It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.

_______________________________________ Signature of Contractor and Date

The following statements supersede & supplement the corresponding items in the specifications & drawings:

1. The plans call for a clear anodic finish, but the specified tubing sizes do not come in an anodized finish. Would we be able to provide them powder coated in an anodized silver color, using woven mesh material from EMS Supply instead?

Response: Contractor may use other aluminum option do not use powder coated steel.

2. What material are the benches in the changing rooms to be constructed of? The benches are identified as Fixture #19 on the fixture pages, which reference Sheet A-401; however, a material or description does not appear to be provided. Please clarify the required bench material and specifications. Response: The bench is CMU block with concrete top.

3. The door schedule lists fiberglass doors in 16 gauge 'stained steel' frames while the details and specification call for hollow metal at 14 gauge. Please confirm the door and frame material, the frame gauge, and what is meant by 'stained steel'

Response: The doors are fiberglass-reinforced polymer doors installed in minimum 16-gauge Type 304 stainless-steel frames with a No. 4 satin finish. “Stained steel” was a typographical error and has been corrected to “stainless steel.” The previous 14-gauge hollow-metal frame reference does not apply and has been removed.

Revised Sheets: - A-302: Door and Frame Schedule and door/frame details revised to identify FRP doors and 16- gauge stainless-steel frames. - A-501: Doors and Windows specification revised to identify FRP doors and minimum 16-gauge Type 304 stainless-steel frames.

4. PPG Aquapon is called out for interior floors on plans/finish schedule; however there is no information in the Architectural specifications (A-501) for fluid applied flooring, there is only a spec for Ceramic Tile – please clarify

Response: Epoxy flooring is required at the interior concrete floors. The drawings and specifications have been revised to provide a complete, seamless, slip-resistant, fluid-applied epoxy flooring system with an integral 6-inch-high cove base. PPG Aquapon WB is identified as the Basis of Design, subject to the manufacturer’s written confirmation that the selected system is suitable for horizontal concrete flooring in this application. A comparable complete resinous-flooring system approved by the Architect and FDEP may be provided.

Revised Sheets: - A-102: Coating Systems Schedule and Room Finish Schedule revised to identify slip-resistant epoxy flooring and a 6-inch integral cove base. - A-501: Fluid-Applied Resinous Flooring requirements added, including substrate preparation, moisture testing, primer, epoxy coats, slip-resistant aggregate, finish coat, and integral cove base.

5. There are no gutters/downspouts shown on the building – please confirm this is accurate. Response: Confirmed. Gutters and downspouts are not provided. Roof runoff will discharge at the building eaves onto the adjacent positive-drainage surfaces. Final grading shall direct runoff away from the building and prevent ponding adjacent to the foundation.

Revised Sheet: - A-102, Detail 2 – Roof Plan: Note added confirming that gutters and downspouts are not provided and describing the roof-runoff and grading requirements.

6. Section 2/A-201 calls for the “West” wall to be waterproofed to 4” below grade. This elevation is labeled “South”. Please clarify which wall is being waterproofed and provide the extent of waterproofing on this wall and product to be used.

Response: The previous waterproofing note was associated with an earlier retaining-wall condition. Civil confirmed that the grading design uses slopes up to the building and walkway slabs and does not require retaining walls. Accordingly, no exterior wall is required to receive below-grade waterproofing under this condition. The conflicting waterproofing note and the associated retaining-wall, form-liner, and waterproofing requirements have been removed.

Revised Sheets: - A-101: Floor-plan and site-interface information revised to remove the retaining-wall condition. - A-201: Building elevations revised to remove the conflicting below-grade waterproofing reference. - A-501: Retaining-wall form-liner and waterproofing requirements deleted.

7. Door Type A has a 2/0 x 2/4 Cutout that is undefined on A302. Please clarify if this is a vision lite or other spec and what the placement/mounting height should be.

Response: The 2'-0" × 2'-4" opening in Door Type A is a factory-installed vision lite. The bottom of the glazing shall be located no more than 43 inches above the finished floor. The Basis of Design is a Special-Lite SL-17 Hybrid FRP Door with a vision lite or approved equal. The complete door and glazing assembly shall comply with applicable safety-glazing and accessibility requirements.

Revised Sheet: - A-302, Detail 11 – Door/Frame Types: Door Type A revised to identify the vision-lite opening, dimensions, mounting height, and Basis of Design.

8. The toilet compartments are called ceiling hung on the keynote and floor-and-ceiling attached in the specification and are given as Bobrick in one place and Ampco or Santana in the other. Please confirm the product and the mounting method. Please also confirm whether a second urinal screen is required for the second urinal and confirm the enclosure at the two accessible water closets.

Response: The toilet compartments shall be ceiling-hung, high-density solid-polymer compartments. Bobrick Sierra Series is the Basis of Design, consistent with the FDEP standard. Previous references to floor-and-ceiling-attached compartments and Ampco or Santana have been removed. Both accessible water closets are enclosed within ceiling-hung toilet compartments with outswinging doors, accessible hardware, and the required clearances. One wall-mounted Bobrick Sierra Series urinal screen is provided between the two urinals. A second screen is not required because the outer urinal is located adjacent to the restroom side wall.

Revised Sheets: - A-101: Floor plan revised to coordinate the toilet compartments and accessible-water-closet enclosures. - A-102: Toilet Accessory Schedule revised to identify ceiling-hung Bobrick Sierra Series compartments and a wall-mounted Bobrick urinal screen. - A-301: Restroom elevations coordinated with the compartments, accessible water closets, and urinal screen. - A-501: Toilet Partitions specification revised to identify Bobrick Sierra Series solid-polymer ceiling-hung compartments.

9. Can you provide a detail for the louvers? In both the doors and the walls.

Response: Please see plans A-302for both louvers and door details.

10. Please clarify the finish floor elevations (F.F.E.). C-102 indicates 17.30 in the restrooms, 17.50 in the changing rooms & 18.30 in the chase. A-100 has 2 elevations in the restroom – 17.50 & 17.30?

Response: The architectural drawings have been revised to coordinate with Civil Sheet C-102. The restroom finished-floor elevation remains EL. 17.30. Chase 103 and the Door 103 threshold are established at EL. 18.30, 1 foot above the restroom finished floor. The exterior concrete landing at Door 103 shall match the threshold elevation and slope away from the building in accordance with C-102.

Revised Sheets: - A-101: Floor

Don’t miss the next one

Save this bid and SledAtlas keeps its deadline for you. Save a search for restroom construction from the card on the left and the next one lands in your inbox on the day it posts.

What happens when you save this bid

  • It goes on your calendar. The response deadline land on your SledAtlas calendar and in your own calendar app through your private feed.
  • You get reminded. One email on each of the days you choose before the deadline (your account default applies until you change it for this bid), and a line on your calendar card until you dismiss it.
  • You hear about changes. If the deadline moves, a pre-bid meeting is added or the status changes, it is in your next daily email.
  • Your notes and documents live on the job. Private to you, on the bid’s own page under My bids.

Create a free account and come straight back to this bid. No card, no password; a sign-in code by email or one click with Google.

Why this bid is on SledAtlas

We read every Florida source we have, and federal work performed in Florida, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.