Water treatment plant electrical and mechanical upgrades

B027-28 Evansville Water Treatment Plant Improvements, issued by City of Meriden.

The job

The City of Meriden is seeking qualified contractors to modernize the Evansville Water Treatment Plant with Variable Frequency Drive (VFD) technology and electrical infrastructure upgrades. The 1970-built facility serves the East Side with 2.0 MGD capacity, and improvements aim to reduce energy costs, enhance operational control, and minimize downtime. Bids due December 15, 2026.

Issuing agency
City of Meriden
Solicitation number
B027-28
Portal id
304131
Type
purchase
Posted
Nov 18, 2026
Response deadline
Dec 15, 2026, 11:00 AM EST
Questions due
Dec 9, 2026, 4:00 PM EST
Place of performance
South Central Connecticut Planning Region, CT

Official posting

Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).

Official description

Solicitation #B027-28. Issued by Water. The City of Meriden is seeking competitive bids from qualified contractors for comprehensive electrical and mechanical infrastructure improvements at the Evansville Water Treatment Plant. Originally constructed in 1970, the facility operates at a maximum flow rate of 2.0 MGD (million gallons per day) and an average daily flow of 0.90 MGD. The plant serves as the primary water supply for the East Side Carpenter Pressure Zone and the Carpenter Avenue Tank, drawing water from the East Well through three greensand media pressure filters. The primary goal of this modernization project is to replace the inefficient, fixed-speed system with advanced Variable Frequency Drives (VFDs) and fully upgrade the supporting electrical distribution infrastructure. By transitioning to VFD technology, the City aims to: Reduce Energy Costs: Eliminate throttling losses by matching pump speed directly to system demand. Enhance Operational Control: Improve flow flexibility, clearwell level management, and overall system resilience. Minimize Downtime: Mitigate mechanical stress on the pumping infrastructure, virtually eliminating downtime caused by mechanical failure.