OpenResponses due Dec 4, 2026, 5:00 PM EST

Fire Station 63 construction, South San Francisco

Community Civic Campus: Phase 3, Fire Station 63, Solicitation pf 2306; Bid 2725, issued by City of South San Francisco.

See 111 similar jobs and what they went for
10 unit prices · 111 similar jobs

What this job goes for

Intelligence

California building renovation bid results, every bidder’s price, Jan 2025 to Jul 2026.

Unit prices for this job’s items

10 items of building renovation work bid in California, last 2 years
  • Record Drawing (“As-Built”) Plans (stipulated amount) · per eachBids usually run (the middle of 9 jobs). Most fall between and .
  • Other than Normal Working Hours in Non Secured Facility (must not be lower than item A adjustment factor) · per adjustment factorBids usually run (the middle of 6 jobs). Most fall between and .
  • Normal Working Hours in Secured Facility (must not be lower than item A adjustment factor) · per adjustment factorBids usually run (the middle of 4 jobs). Most fall between and .
  • Other than Normal Working Hours in Secured Facility (must not be lower than item C adjustment factor) · per adjustment factorBids usually run (the middle of 4 jobs). Most fall between and .
  • 1 Gallon Shrubs · per eachBids usually run (the middle of 4 jobs). Most fall between and .
  • Construct Concrete Collar · per eachBids usually run (the middle of 4 jobs). Most fall between and .
  • Normal Working Hours in Non Secured Facility (enter adjustment factors as five digit number (e.g."1.2345") · per adjustment factorBids usually run (the middle of 3 jobs). Most fall between and .
  • Normal Working Hours in Non Secured Facility · per adjustment factorBids usually run (the middle of 3 jobs). Most fall between and .

And 2 more items.

The job

The City of South San Francisco seeks a general contractor to build a new two-story fire station (approximately 10,150 sq ft) at 71 Camaritas Avenue, including a three-bay apparatus garage, firefighter living quarters for six personnel, and site improvements. Work includes structural, mechanical, electrical, plumbing, fire protection, and communications systems, with a bid due date of November 13, 2026.

Trade
Building renovation and general construction
Also includes
Site work, excavation, grading; Storm drainage, culverts, erosion; Paving and asphalt; Electrical and lighting; HVAC; Plumbing; Fire alarm and sprinklers; Generators; Landscaping, mowing, grounds; Fencing and gates; Concrete, sidewalk, curb
Kind of work
New fire station construction with site improvements
The work
New construction or installation
Contract
One job
Size
10,150 sq ft, as the posting states it
Who can bid
Any qualified firm.
Solicitation number
pf 2306; Bid 2725
Portal id
316027
Type
purchase
Posted
Oct 12, 2026
Response deadline
Dec 4, 2026, 5:00 PM EST
Questions due
Nov 16, 2026, 6:00 PM EST
Answers posted
Nov 25, 2026, 8:00 PM EST
Place of performance
San Mateo County, CA

Official posting

Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).

Official description

Solicitation #pf 2306; Bid 2725. Issued by Capital Projects. The Project includes, but is not limited to: Construction of a new approximately 10,150-square-foot, two-story Fire Station 63 and associated improvements on an approximately 1.07-acre site at 71 Camaritas Avenue, at the corner of Camaritas Avenue and Westborough Boulevard in South San Francisco. The station will include a three-bay apparatus garage, watch room, captain’s office, and operational support spaces, including medical, decontamination, turnout gear storage, self-contained breathing apparatus (SCBA), and workshop areas. The building will also include an exercise room and a dedicated display area for a historic fire engine. Firefighter living quarters will include six individual dormitories, restrooms and showers, a kitchen, pantry, dining area, dayroom, study, laundry facilities, and an outdoor terrace. Site improvements will include grading, utility infrastructure, stormwater drainage and treatment, apparatus driveways and aprons, public and secure personnel parking, electric vehicle charging facilities, sidewalks and accessible paths of travel, fencing and access gates, landscaping, irrigation, site lighting, and a covered trash enclosure. The work includes the building’s structural and architectural components, mechanical and plumbing systems, electrical and standby power systems, fire protection, and communications and security systems, as detailed in the Contract Documents.

Open building renovation bids in California

Other trades in California: Site workStormwaterPavingPick another trade

On the free plan a trade inside a state is your one specific search of the day; a plan searches every trade, every place.

Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.